Laserfiche WebLink
' A <br /> D. Alternate construction for new underground storage tanks containing motor vehicles fuel [Section 26337. <br /> (1) Monitoring and response plan [Section 2634]. <br /> (2) underground storage tank composed of.... <br /> (a) Fiberglass reinforced plastic. <br /> (b) Cathodicatty protected steel. <br /> (c) steel clad with fiberglass reinforced plastic. &k I STi V�of <br /> (d) Other material that complies with section 2631 and 2632. J <br /> _ (3) Floor of leak interception and detection system constructed on a firm base and sloped to a <br /> collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br /> _ (4) Access casings installed in the collection scarp of She secondary containment system with <br /> backfill in the interstitial space. The access casing shall meet all of the following: <br /> Designed and installed to allow the liquid to flow into the casing. <br /> Sized to allow removal of collected liquid and able to withstand all anticipated applied <br /> stresses. <br /> Constructed of material that wil'. not be structurally weakened. <br /> Screened along entire vertical zone of permeable material. <br /> Capable of preventing leakage of any hazardous substance from the casing. <br /> Extend to the ground surface and covered with a locked waterproof cap. <br /> I <br /> = Capable of meeting S.J. Co. PHS-E HD Well Standards. <br /> Leak interception and detection system shall prevent the leaked hazardous substance from <br /> entering ground water. <br /> 14. INTERSTITIAL SPACE MONITORING <br /> I <br /> A. Visual monitoring [Section 2632 (c) (1)) <br /> (a) Exterior surface and floor beneath tank monitored by direct viewing <br /> (b) Daily visual inspections <br /> (c) Liquid level in tank to be recorded at time of inspection <br /> (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br /> has occurred. <br /> B. Mechanical or electronic monitoring (Section 2632 (c) (2)] <br /> (a) Continuous monitoring system connected to an audible and visual alarm system. <br /> Monitoring equipment to be installed <br /> I Manufacturer: 1_tn L Q0 14, <br /> I Model Number: T 5 1 UO I <br /> Sensor Type: Vapor , Liquid _ Both. <br /> Sensor/Panel specifications. <br /> _ <br /> Location(s) fotr�sensor's: <br /> Tank:A)Alps-�pru_(._ Piping: . <br /> Dispenser I _ ��1t� <br /> C. Monitoring and response plan submitted CSection 2632 (d) (1) 6 (2)). <br /> 15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 1° tank or <br /> double-wall UST. (Section 2631 (b)) <br /> _ A. Approved by a nationally recognized independent testing organization. <br /> B. Demonstration of integrity with the primary and/or secondary containment. <br /> 6 <br /> I <br />