My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2002 INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
INSTALL 2002 INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:57 PM
Creation date
11/7/2018 6:28:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 INSTALL
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\2002 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,l,,,klid <br /> HD r,N3 <br /> [00Z 6 1 100 <br /> Johnson Petrokum Conduction Inc. <br /> In/ury and Illnm prr"Hm program <br /> .Johnson Petroleum Construction Inc. is dedicated to providing a <br /> safe and healthy workplace for our employees. We consider the <br /> prevention of accidents to be an integral part of our operation, <br /> and to these ends, we have established a comprehensive Injury and <br /> Illness Prevention Program to assure the continued safety of you, <br /> the employees of Johnson Petroleum Construction Inc. This <br /> program is designed to: <br /> 1 . Identify and evaluate jobsite hazards, <br /> 2 . Establish methods for correcting unsafe or unhealthful <br /> conditions , <br /> 3 . Develop a system to communicate with our employees, <br /> concerning safety matters, and to encourage feedback, ] <br /> 4 . establish a training and retraining program for employees , <br /> and <br /> 5. Develop an enforcement and disciplinary system to ensure <br /> that employees comply with JPC safety program. <br /> The responsibility and authority for the implementation of this <br /> Injury and Illness Prevention Program is assigned to: <br /> Darryl Johnson, Project Manager <br /> Johnson Petroleum Construction Inc. ' Program Implemented: <br /> P.O. Box 7169 Date: -�� 's <br /> Auburn CA 95604 <br /> (916 ) 878-6834 <br />
The URL can be used to link to this page
Your browser does not support the video tag.