Laserfiche WebLink
8. a. Describe the methd that will be uplize to pu a andlor inert the to s <br /> �U(�' _ _) <br /> ' t 4 y ` <br /> b. Tank/Piping Hauler: �. `/ <br /> Name W t--S—C w6T NT <br /> Address :7 �p WIZT LIN W"D City l U 457-_- ZIP <br /> Phone No, _______) 664%a6 E2 <br /> Hauler Registration#(if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name A+5 "MSM - <br /> Address 2L-Lb W City o p <br /> Phone No, <br /> EPA ID#(if transported to a permitted TSD facility) p Fl <br /> 9. Is the sampling firm an independent third party from the contractor? YES NO[] <br /> 9a, Describe,In detail,how the soil and/or water samples)beneath the tank and piping will be obtained: <br /> O <661 L 6!z T aE�1 <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: 12 <br /> -- � LL , <br /> D <br /> 11, Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> I — ",$A / Tb <br /> e)Contaminated Soil Hazardous Waste Hauler: e <br /> Name V -T'R0,4 -A- Hauler Registration# J <br /> Address U- City Zip <br /> Phone No.(�Z(� ) <br /> EH 23 046(Revised 08113199) Page 5 <br />