Laserfiche WebLink
OCKFILL EXCAVA`T'ION CERTIFICATE <br /> Project Location 91 PIMI Ub ► D,� ► <br /> Owner U+�+ T '+� , Phone No. <br /> Contractor Phone No. License No. rJ� <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> ,?goA. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> _ B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Li <br /> Name (Print) <br /> Fitle (Print) <br /> Diature <br /> Shall be the responsible managing employee on the license or authorized agent. <br />