Laserfiche WebLink
8. a. Describe the meth d that will be ulill"efi to pugge and/or inert the tanks <br /> D (CO-L VIA <br /> L6,5- <br /> b. TanklPiping Hauler: n, <br /> Name is-51- <br /> Address L CityM 1a5 7-V-- Zip <br /> Phone <br /> Hauler Registration#(if hauled as hazardous) Af b, <br /> e. TanklPiping Disposal Site: <br /> Name�A! 5 1 (' <br /> Address beLJ W City � %gyp <br /> Phone No.( j � <br /> EPA lD#(if transported to a permitted TO facility) i�a�- ` <br /> 9. Is the sampling firm an independent third party from the contractor? YES NO[[ <br /> 9a. Describe,in detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained: T <br /> IE SIL b L r <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 6—T? 'Lam ( j> <br /> b)What will be the final destination of the excavated stockpile? Tb <br /> c)Contaminated SS-oil Hazardous Waste Hauler: <br /> Name R� L ( 9"4L Hauler Registration# P <br /> Address 33)6 <br /> lel.+ cid �Y' S l a Zip 52/ <br /> Phone No.( ] <br /> EH 23 046(Revised 08113199) Page 5 <br />