Laserfiche WebLink
OPV- P <br /> V-- STATE OF CALIFORNIA <br /> f�f�J STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B cA <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT a 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM �� 2 INTERIM PERMIT F74 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED a <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ✓ <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.1 () B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-1 IS MARKED,COMPLETE iTEM C. <br /> GULAR 3 DIESEL <br /> A 1 MOTOR VEHICLE FUEL F74 OIL B. C. <br /> ❑ 1aUNLEADED 4 GASAHOL ❑ 8 AVIATION GAS <br /> ❑ 2 PETROLEUM 80 EMPTY Ete1 PRODUCT ❑ IbUNPREMIUM <br /> ❑ 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ©2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW). <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A,S.s <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL 1-1 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W1 FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL �5 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED 2TI-95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV,PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B, CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A911 5 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELWICOATING A U B 100% METHANOL COMPATIBLEW/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 9 INTERSTITIAL <br /> MCNITORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO17IMATED <br /> SUBSTANCE REMAINING GALLONS I INERT MATERIAL? ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE:BEST OF MY KNOWLEDGE, 1S TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 3 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# Z �� [ I LL <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED, <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (12-91) ` �_ ( - J�nE._ 91 FOR90346-R5 <br />