My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
1950
>
2300 - Underground Storage Tank Program
>
PR0504240
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 9:26:42 AM
Creation date
11/7/2018 7:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0504240
PE
2361
FACILITY_ID
FA0006136
FACILITY_NAME
QUICK TRUCK REPAIR
STREET_NUMBER
1950
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15308006
CURRENT_STATUS
02
SITE_LOCATION
1950 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MINER\1950\PR0504240\INSTALL\1995 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MOIVT?"ORIIv'G PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRA-Lv'1 <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating xrmit. 'Ihe permit holder most notify San Joaquin County <br /> Environmental Health Division. phone (209) 468-2420 within 30 days of any changes to the monitonng <br /> procedures, unless required to obtain approval before malting the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name Penske Truck Leasing Co., L.P. <br /> Facility Address 1950 E. Miner St., Stockton, CA 95205 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank Continuous <br /> Piping continuous <br /> $. What methods and equipment, identi5ed by name and mode', will be used 'Cr <br /> performing the monitoring: <br /> Tank Interstitial sensor between tank dor,hle vatls mnn;rorg mnr;nnnnsly <br /> for OST leaks by Veeder-Root TLS350. <br /> P:ping,_Double walled Enviro-Flex ninina with intarctiC+ ^e +^ in <br /> sumps and dispenser pans monitors continuously by yeeder-Rent Tf Ra5fr_ <br /> C. Describe the locations) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> See site plan. <br /> D. Last the name(s) and titic(s) of the people responsible for perfo,-ri=g the monitoring <br /> and/or maintaining the equipment: <br /> Jon Foster, District ManacLeg;„ - <br /> Reporting format for monitoring: <br /> Tank: V.Veder-Root TLS350 will go into alarm mode in the event p oduct detected it tank <br /> -- - 'IrtLersti i <br /> Piping: Veeder-Root TLS350 will go into alarm mit in rhe event of_any _— <br /> product detected in the piping or dispenser sumps. <br /> Desenbe the preventive maintenance schedu;e for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L'months: Site hires Veeder-Root authorized representative <br /> to conduct annual functionality test to ensure system i_s operatl.n4 per the <br /> manufacturers specifications. Other repairs scheduled a n <br /> G. Descrbe the training necessary for tine operation of UST system, including piping, <br /> and the monitonng equipment: Minimal training needed and provided by <br /> Veeder-Root authorized representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.