My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
221
>
2300 - Underground Storage Tank Program
>
PR0504826
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 10:53:23 AM
Creation date
11/7/2018 7:20:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0504826
PE
2381
FACILITY_ID
FA0006355
FACILITY_NAME
M J BEVANDA PROPERTIES
STREET_NUMBER
221
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
221 E MINER AVE
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MINER\221\PR0504826\REMOVAL 1993 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?-I SAN JOAQU1N COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E HAZELTON AVE., STOCKTON,CA 95205 <br /> ki4'A��* DEVELOPMENT SERVICES PHONE (2091468-3120 <br /> PLANNING PHONE_ 1209) 460.3120 <br /> BUILDING PHONE_1209) 468-3t23 <br /> NEIGHBORHOOD PRESERVATION PHONE! {209)4.683021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 221-225 �'IINER AVENUE, STOCKTON, CALIFORNIA %202 <br /> Owner 11.J- BEVANDA PROPERTIES Phone No. (213) 877 5246 <br /> Contractor FALCON ENERGY Phone No.(209) 463 7108 License No. 584524 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1, submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 12" lifts: <br /> A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> inch in diameter. <br /> B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> JAMES J. HOBLI TZELL <br /> Name (Print) <br /> V.P. <br /> ;;;Title:(Pr_iht) <br /> ure <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/S'ECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.