My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
835
>
2300 - Underground Storage Tank Program
>
PR0500808
>
REMOVAL REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:44 PM
Creation date
11/7/2018 7:41:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL
RECORD_ID
PR0500808
PE
2381
FACILITY_ID
FA0004894
FACILITY_NAME
JAMES A BRYSON
STREET_NUMBER
835
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
13932008
CURRENT_STATUS
02
SITE_LOCATION
835 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MINER\835\PR0500808\REMOVAL.PDF
QuestysFileName
REMOVAL
QuestysRecordDate
3/1/2012 8:00:00 AM
QuestysRecordID
178433
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> i <br /> t <br /> 5.) Water Not Present In Tank Pit: <br /> Tank Size (A) 0 to 1,000 gallons a minimum of one soil <br /> samples will be taken from either the pump , <br /> or the fill end of' the tank, below bottom of <br /> tank. <br /> , (B) 1,001 to 10,000 a minimum of two soil samples <br /> f will be taken. One sample from each end of <br /> the tank; below bottom of tank. <br /> {i (C) 10,001 and up a minimum of three soil samples <br /> will be taken spaced evenly along the lenoth <br /> of the tank, below bottom of tank. <br /> 6. ) Water is Present in Tank Pit: <br /> Tank Size (A) 10,000 gallons or less (single tank) the <br /> minimum number of soil samples will be <br /> two from the tank wall at each end of <br /> soil/ground water interface. The minimum <br /> number of water samples shall be one. <br /> (B) 10,001 and larger tank, or a cluster of <br /> tanks the minimum number of soil samples <br /> to be taken shall be four, one from each <br /> wall at soil/ground water. interface. A <br /> minimum of one water sample shall be taken. <br /> t <br /> CHEMICAL SECTION: <br /> 1. ) Contents of Tank: Gas in 5,000 gallon tank. <br /> Waste oil in 300 gallon tank. <br /> t <br /> 2. ) Residual: Tanks are to be pumped dry prior 'to start of 4ob by <br /> DeRollo Mazda. <br /> F 3. ) Authorization: Spil analysis for of release is attached. <br /> I <br /> r <br /> i <br /> i . <br />
The URL can be used to link to this page
Your browser does not support the video tag.