Laserfiche WebLink
JUL-04-2088 12:3O Station Systems 488 938 8888 P,83 <br /> Monitoring System Certification- Palo of 3 <br /> Site Address: 4219 Morada Ln. a@. Date of Testing/Servicing: 615108 <br /> D. Results of Testing/Servicing <br /> Software Version Installed, 0 <br /> Com lete the follo ring checklist: <br /> 11 Yes ❑ No* Is the audible alarm operational? <br /> a Yes Q No* Is the visual alarm operational? <br /> Yes ❑ Noy Were all sensors visuaily inspected, functionally tested, and confirmed operational? <br /> 18 Yes 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with them proper operation? <br /> lS Yes 0 No* If alarms are relayed to a remote monitoring station, is all communications equipment(e-g, modem) <br /> ❑ NIA operational? <br /> <S Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detcets a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) IR Sump/Trench Sensors; t$ Dispenser Contaitmaent Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor failure/disconnection? t$ Yes ❑No <br /> tS Yes o No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 0 NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90 % <br /> Q Yes* lS 'No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* 1g No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> rl product;q Water. If yes,describe causes in Section E, below. <br /> EZ Yes 13 No* Was monitoring system set-up reviewed to ensure proper settings? Ottach set-up rc arts, r a licable) <br /> C�Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Secondary Brine sensors tested/passed in All STP Sumps, All Fill Sumps and All Dispenser <br /> Pans. <br /> Vent Sump and Secondary Brine sump sensors testedlpassed. <br /> Prem/Diesel share annular space. <br />