My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INTERNATIONAL
>
1115
>
2300 - Underground Storage Tank Program
>
PR0231707
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:37:53 PM
Creation date
11/7/2018 8:07:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231707
PE
2361
FACILITY_ID
FA0003948
FACILITY_NAME
PG&E TRACY MAINTENANCE STATION
STREET_NUMBER
1115
Direction
N
STREET_NAME
INTERNATIONAL
STREET_TYPE
PKWY
City
TRACY
Zip
95377
APN
209-080-06
CURRENT_STATUS
02
SITE_LOCATION
1115 N INTERNATIONAL PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE\24081\PR0231707\INSTALL 1988.PDF
QuestysFileName
INSTALL 1988
QuestysRecordDate
8/11/2017 9:42:24 PM
QuestysRecordID
3574648
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION/CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAL <br /> Uj'- 1 . Provide the name and address of the facility. <br /> L,L 2. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s) , and operator(s). <br /> I _ 3. Provide four complete sets of plans. (One to be retained by this office). <br /> Include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> Ck_ 1 . Location(s) and number of tanks. T)�eseL - 3/pOc) tP a <br /> n»st e0m b 2. Type of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. <br /> / T-7735,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br /> in round. G 7 f 1 E / gF-c ts" 1)LiG_ <br /> Fiberglass CC) Xc� <br /> 1 . Striker plate dimeh�ions and materials <br /> /2. Striker plates under all accessible openings. <br /> �C. Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ) . <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required) . <br /> 8: Other types of tanks <br /> 1 . Construction specification standards for durability. <br /> 0(2— 3. Tank Capacity (List specific gallonage) . 3)0cxu �1 k bolt. ZieseO °u e <br /> c, L_4. Contents to be stored in each tank (Be specific) . D eye( <br /> A. Verification of product computability with the tank(s), pipiAg, monitoring <br /> device(s) , epoxy or silicone glues, etc. <br /> 1 . List testing organization and approval . UL=h sty S� <br /> 73 k3-7, I — 14-1 I Npeft <br /> 1))Vsf(ow Provide manufacturers written installation instructions. Include all piping, <br /> monitors, tanks, etc. <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is required—on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon completion of installations. <br /> ne test result copy to be sent directly to this department from the <br /> testing company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.