Laserfiche WebLink
California Environmental Reporting System (CERS) Underground Storage Tank-Tank Information <br /> Facility/Site <br /> Regional Transportation Center , ' CERS ID <br /> 849 E Myrtle St C_` 10642219 <br /> Stockton,CA 95205 �� �✓ <br /> Submittal Status jv% 1 4t <br /> Submitted on 10/6/2015 by JoyJohongiri of SAN JOAQUIN REGIONAL TRANSIT(STOCKTON,CA) ►�- 1 t.G/ ,, -(� ,,/� <br /> Submittal was Accepted;Processed on 10/6/2015 by Cindy Vo for San Joaquin County Environmental Health `�' tit 4 1 iJ+ .Uk), ) (5' <br /> Comments by regulator:This UST submittal was accepted by,Cindy Vo,EHS,ICC Certified UST Inspector,on October 6,2015. Additional changes or updates to CE .10 <br /> may be required upon field verification.This acceptance is subject to verification at the next scheduled field inspection.Thank you. <br /> Type of Action }- Q a O 1 <br /> Type of Action(UST Tank) <br /> Confirmed/Updated Information �� 075 <br /> Facility Information <br /> Regional Transportation Center <br /> 849 E Myrtle St <br /> Stockton,CA 95205 <br /> Tank Description <br /> Tank ID# Date UST System Installed Tank Configuration <br /> 3 10/22/2014 A Stand-alone Tank <br /> Tank Manufacturer Date Existing UST Discovered Number of Compartments in the Unit <br /> Containment Solutions 1 <br /> rank Capacity In Gallons Date UST Permanently Closed Additional Description <br /> 10000 <br /> Tank Use and Contents Tank Construction <br /> Tank Use Tank Contents Type of Tank <br /> Motor Vehicle Fueling Regular Unleaded Double Wall <br /> Other Petroleum Contents Primary Containment Secondary Containment <br /> Fiberglass Fiberglass <br /> Other Non-Petroleum Contents <br /> overfill Protection <br /> Yes Audible/Visual Alarms Yes Fill Tube Shut-Off Valve <br /> Ball Float Exempt <br /> Product/Waste Piping Construction <br /> iping Construction Primary Containment secondary Containment Piping/Turbine Containment Sump <br /> Double-walled Fiberglass Fiberglass Double-walled <br /> iping System Type <br /> Pressure <br /> Vent,Vapor Recovery(VR)and Riser/Fill Pipe Piping Construction <br /> Primary Containment Vapor Recovery Primary Containment Riser Pipe Primary Containment Vent Piping Transition Sumps <br /> Fiberglass Fiberglass Steel Double-walled <br /> Fill Components Installed <br /> Secondary Containment Vapor Recovery Secondary Containment Riser Pipe secondary Containment Yes Spill Bucket <br /> Fiberglass Fiberglass Fiberglass Yes Striker Plate/Bottom Protector <br /> Yes Containment Sump <br /> under Dispenser Containment(UDC) Corrosion Protection <br /> Construction Type Construction Material Sacrificial Anode <br /> Double-walled Fiberglass Impressed Current <br /> Yes Isolation <br /> Applicant Certification <br /> Applicant Name Applicant Title Date Certified <br /> Wendell Krell Director of Facilities <br /> Printed on 10/13/2015 8:35 AM <br />