Laserfiche WebLink
AST EVR. Phase I Attestation <br /> Cert No: 1295 <br /> oma:.• <br /> On: 5/15/2012 <br /> A044 <br /> 0 <br /> PetersonHydraulics, Inc. <br /> Tested By: Lucas Janes <br /> � r <br /> mr�+rn�l <br /> Completion of this training course does not create a warranty or guaranty by oPW of your installation and/or maintenance of <br /> nozzles, vapor recovery systems and AST EVR PHASE I systems. This training course does not eliminate the need to strictly <br /> adhere to manufacturer instructions and procedures when Installing and maintaining nozzles, vapor recovery systems and AST <br /> EVR PHASE I Systems. All nozzles, vapor recovery systems and AST EVR PHASE I Systems must be insta/led and maintained in <br /> accordance with manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />