Laserfiche WebLink
AST EVA. Phase I Attestation <br /> Cep t flo: 1291 <br /> On: 5/15/2012 <br /> Peterson Hydraulics, I <br /> Tested By: Lucas Jones <br /> Completion of this training course does not create a warranty or guaranty by OPW of your installation and/or maintenance of <br /> nozzles, vapor recovery systems and AST EVR PHASE I systems. This training course does not eliminate the need to strictly <br /> adhere to manufacturer instructions and procedures when installing and maintaining nozzles, vapor recovery systems and AST <br /> EVR PHASE]Systems. All nozzles, vapor recovery systems and AST EVR PHASE I Systems must be installed and maintained in <br /> accordance with manufacturer instructions and procedures. Attestation applies ON[Y to tested named individual. <br />