Laserfiche WebLink
.SVR Phase I Attestation <br /> I" ce►t No: 6688 <br /> n On: 5/15/2012 <br /> G 9 <br /> PetersonHydraulics, Inc ,, <br /> Tested By: Lucas Janes <br /> Completion of this training course does not create a warranty or guaranty by OPW of your installation and/or maintenance of <br /> nozzles, vapor recovery systems and EVR PHASE I systems. This training course does not eliminate the need to strictly adhere <br /> to manufacturer instructions and procedures when installing and maintaining nozzles, vapor recovery systems and EVR PHASE 1 <br /> Systems. All nozzles, vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br /> manufacturer instructions and procedures. Attestation applies ONLY to tested named individual. <br />