My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeff Wong [EH] <br /> From: Dan Peterson <dpeterson@petersonhyd.com> <br /> Sent: Friday,August 08, 2014 10:37 AM <br /> To: Jeff Wong [EH] <br /> Subject: RTD fuel permit <br /> Hi Jeff, s <br /> I reviewed our drawings for information on the above ground piping from the UST's. ! <br /> Sheet one, "scope of work"of the submitted drawings states that the above ground piping will be double wall i <br /> steel. This is also shown on FS 2.1.6. <br /> i <br /> Leak monitoring of the above ground piping will be as follows: <br /> The piping will slope back to the transition sump located in the fuel room. Any leaks into the secondary piping will be i <br /> sensed by the liquid sensor in this sump. The sump sensor will then shut down the turbine pumps. NFPA 30 requires <br /> that all aboveground piping shall be able to be visually inspected. The addition of a double wall system for this piping <br /> requires that the proposed system for leak monitoring by the Veeder Root system be utilized. See drainage pipe shown <br /> on FS 9.01 detail 3. <br /> I have attached the building permit receipts for your reference. I have also requested a letter regarding the Fire <br /> Department permit. I was just informed that the SPCC plan will not be needed until the tanks are ready to be filled. <br /> Please let me know if the above information is adequate for issuance of this permit. <br /> Thank you for your efforts on our behalf. <br /> Daniel G. Peterson <br /> Peterson Hydraulics, Inc. <br /> phone 310-323-3155 i <br /> Cell 310-629-0583 <br /> e-mail:dpeterson@petersonhyd.com <br /> The contents of this e-mail message and any attachments are confidential and are intended solely for addressee. If you <br /> have received this transmission in error,any use,forwarding, reproduction, distribution or dissemination of this <br /> transmission is strictly prohibited. If you are not the intended recipient, please immediately notify the sender by replying <br /> to this e-mail or phone and delete this message and its attachments, if any. <br /> 3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.