Laserfiche WebLink
JW <br /> San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> Donna Heran,REHS <br /> z h 1868 East Hazelton Avenue <br /> W: Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> cq .. ..• '�P Website:www.sjgov.org/ehd Kasey Foley,REHS <br /> Linda Turkatte,REHS <br /> Phone: (209)468-3420 Rodney Estrada,REHS <br /> April 29, 2014 Fax: (209)464-0138 Adrienne Ellsaesser,REHS <br /> Peterson Hydraulic,Inc. �--- <br /> 1653,W.El Segundo Blvd. T�;ti e C-o <br /> Gardena,CA 90249 <br /> RE: San Joaquin RTD,2849 E. Myrtle, Stockton SR0069410 <br /> The San Joaquin County Environmental Health Department (EHD) has received the permit <br /> application on April 10, 2014 to install the following underground storage tank (UST) system at <br /> the above noted address: <br /> 40,000-gallon UST, DT1 (ID#TA 0520756) Diesel Grade, <br /> 40,000-gallon UST, DT2 (ID#TA 0520755) Diesel Grade, <br /> 10,000-gallon UST, GT1 (ID#TA 0520754) Regular Unleaded Grade, <br /> Associated piping, dispensers, turbine pumps, appurtenances, and monitoring system <br /> EHD has completed review of the above permit application. The permit cannot be approved <br /> until the following have been submitted to EHD for further review: <br /> 1. Submit Page 3 of the Permit Application with Workers Comp information (including <br /> expiration date), and Stockton Fire Department Permit# and Building Permit# (or a <br /> copy of the submitted permit applications). <br /> 2. Revise and submit Page 8 of the Permit Application with specific sensor models and the <br /> manufacturer, not just the Monitoring Panel model. Also, an electronic sensor is <br /> required for the dispenser pan since the facility is a VPH site and there is no drainage <br /> into secondary containment piping. <br /> 3. Submit a copy of the Health and Safety Plan complete with diagram and quickest route <br /> to the nearest hospital. <br /> 4. Submit blue print with California licensed Professional Engineer stamp, signature, and <br /> expiration date. <br /> 5. Submit copies of ICC Technician, ICC Installer's certificates, and manufacturer training <br /> certifications for each person that installs or tests any of the UST system components. <br /> 6. Submit the most current manufacturer's installation instruction for Containment Solution <br /> UST. <br /> 7. Submit copies of manufacturer's cut sheet for each component of the UST system <br /> including the fuel systems, fill sumps, piping sumps, vent transition sumps, filter <br /> transition sump, monitoring system, and any related equipment that require thirty party <br /> testing. <br /> 8. Submit third party testing verification of all UST system components per California Code <br /> of Regulations, Title 23, Section 2631(b). <br /> 9. Submit Buoyancy calculation signed by a California licensed Professional Engineer. <br /> 10. Provide drawing of deadmen anchors, turnbuckles, and hold-down straps accurately <br /> illustrated on the blue print. <br /> 11. Provide calculation for the flapper drop tube cutoff length that will meet shut off <br /> requirement for overfill protection per Section 2635(b)(2). <br /> 12. Neither Sheet FS4.03 nor FS9.01 indicate if the top of the fuel filter transition sumps are <br /> flush with surface grade, and that the surrounding floor is sloped to the sumps. The <br />