My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeff Wong [EH] <br />From: Dan Peterson <dpeterson@petersonhyd.com> <br />Sent: Sunday, February 15, 2015 1:47 PM <br />To: Jeff Wong [EH] <br />Subject: FW: FUEL PERMIT CLARIFICATIONS <br />Attachments: Answered -RFI -01 91 -0 <br />_Canopy_Fuel_System_to_Fit_Equipment_Locationlsland_ConfirmationReport.pdf, <br />For_Review_RFI_0194-0_Exterior_Vent_Sump, <br />_Healy_Ta.nk_&_Fuel_Diesel_Tank_Finish_Site_Concrete_Grade_Elevations.pdf <br />Hi Jeff, <br />The following e-mail describes the revisions 1 through 4. The two attached RFI's.provide further detail. Also, please see <br />the e-mail train between Kasey and Matt regarding revision 5 and the above ground sump. Let me know if you need <br />something more formal than this. <br />Daniel G. Peterson <br />Peterson Hydraulics, Inc. <br />phone 310-323-3155 <br />Cell 310-629-0583 <br />e-mail: dpeterson@petersonhyd.com <br />The contents of this e-mail message and any attachments are confidential and are intended solely for addressee. If you <br />have received this transmission in error, any use, forwarding, reproduction, distribution or dissemination of this <br />transmission is strictly prohibited. If you are not the intended recipient, please immediately notify the sender by replying <br />to this e-mail or phone and delete this message and its attachments, if any. <br />From: Miklos Laszlo [mailto:mlaszlo@petersonhyd.com] <br />Sent: Thursday, February 12, 2015 2:56 PM <br />To: 'Dan Peterson' <br />Subject: FUEL PERMIT CLARIFICATIONS <br />Dan, <br />In the title block are 5 revisions. Revision 1 and 2 are per Health department comments. <br />3 and 4 are based .on two RFIs, regarding the elevations and concrete island, which will not affect at all the permit, these <br />two revisions are more for our use. <br />The revision 5 is based on what Matt spoke with Health Department. Below you can find the e-mail from Kasey Foley to <br />Matt, allowing us to submit the drawings showing the AG sump. <br />Regarding how many AG sumps will have, on equipment schedule, drawing F50.03, item. 58, under quantity is 4, on <br />drawing FS2.16, clouded with delta 5 with the note at the end: TYPICAL OF 4. If it's a note somewhere on the drawing <br />saying is only 1, that's a mistake. <br />Attached I'm sending you the RFI referred in the title block. <br />Let me know if you have any questions. <br />Regards, <br />914iky Laszfo <br />
The URL can be used to link to this page
Your browser does not support the video tag.