My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Double-Wall Double-Wall Compartment TestinD4, D5 <br /> 12. Open valve to vent primary tank. Figure D5-11 <br /> 13. Maintain pressure on the annular space Air Supply Air Supply Air Supply <br /> (see Figure D4-3). valve closed <br /> Figure D4-3 <br /> Valve Open Hose <br /> Primary Tank <br /> Fitting Annular Space J <br /> Valve Closed G psig <br /> Fitting Annular Space 5J psig5 psig <br /> 5 psig <br /> 7. Close valve on each compartment"Tank Test <br /> Manifold."Disconnect the air supply line. <br /> 8. Monitor the pressure for 30 minutes for any loss in <br /> 14. Observe and monitor the gauge on the annular <br /> pressure from the initial reading which may indicate <br /> a leak. <br /> space for 30 minutes for any loss of pressure which <br /> may indicate a leak. 9. With all compartments under pressure, cover fittings <br /> 15. While under pressure, cover tank outer surface, and manway(s)with soap solution and inspect. <br /> including fittings and manway(s)with soap solution 10. Open valve between primary tank and annular <br /> and inspect. space in order to pressurize the annular space using <br /> 16. After completing air test, release pressure. the existing pressure in the primary tank(pressure <br /> in the primary tank may drop slightly). <br /> 17. Remove all gauges,valves, and hose assemblies. 11. Close valve to annular space. <br /> 18. Replace and tighten fitting plug(s). 12. Open valves to vent all compartments <br /> 19. Replace the plastic vent plugs in the open fittings. (maintain 5 psig on annular space) <br /> (see Figure D5-2). <br /> DOUBLE-WALLD5. TESTING A <br /> •CMPARTMEFigure D5-2 <br /> DOUBLEANNULAR SPACE AND Valve Open Valve Open Valve Open <br /> Valve Closed <br /> WOO <br /> • 5 PSi9 <br /> Ennnect the air supply directly to the annular <br /> itoring fitting or tank damage will result. <br /> Perform the following in the order listed. <br /> 1. Comply with the requirements of Section C. <br /> 2. Connect"Tank Test Manifolds'to each <br /> compartment. 13. Monitor the pressure for 30 minutes for any loss in <br /> pressure from the initial reading which may indicate <br /> 3. Connect hose between a primary tank fitting and a leak. <br /> "Annular Space Gauge and Valve" <br /> (refer to Figure D4-1). 14. While under pressure, cover tank outer surface, <br /> 4. Close valve between primary tank and annular including fittings and manway(s), with soap solution <br /> and inspect. <br /> space. <br /> 15. After completing air test, release pressure. <br /> 5. Connect the pressure source to the <br /> "Tank Test Manifold"on each compartment. 16. Remove all gauges, valves, and hose assemblies. <br /> 6. Pressurize all compartments to 5 psig 17. Replace and tighten fitting plug(s). <br /> (3 psig for 12'tanks). 18. Replace the plastic vent plug in the open fittings. <br /> (see Figure D5-1) <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.