My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ft <br /> Wvl <br /> L F, G <br /> GEOTEXTILE FABRIC INSTALLATION MINIMUM BURIAL DEPTH-NO TRAFFIC LOAD <br /> • Line the side and bottom of the excavation with • 4'- 10'tanks need a minimum cover of 24"backfill or <br /> geotextile fabric. 12"backfill plus 4"reinforced concrete <br /> • Overlap adjoining geotextile panels a minimum 12". (see Figure G-2). <br /> • Place backfill on top of the geotextile fabric to hold it • 12'tanks need a minimum cover of 42"backfill <br /> in place. or 38"backfill plus 4"reinforced concrete. <br /> • In wet hole conditions,backfill on top of the geotextile • Local codes may require deeper minimum burial <br /> fabric is necessary to sink and hold it in place. depth. <br /> Figure G-2 <br /> 4"Reinf.Concrete <br /> Qi • <br /> !-A'+ (102mm) <br /> Adhere to the minimum and maximum dimensions in this \ :'24"Backfill Min. <br /> section. / (610mm) 12"Backfill Min. / <br /> \ '..•. _'_' (305 mm) / <br /> In wet conditions, sufficient overburden and/or an <br /> appropriate anchoring system must be used to offset \ _ <br /> buoyancy of the tank. Refer to the'Anchor Chart" <br /> (Appendix A)for minimum burial depth in buoyant \\•:• <br /> conditions. �// ' No Traffic <br /> \\ \\ <br /> Figure G-1 <br /> Diameters <br /> 12"Min. 12' Min. <br /> (305" (305mm) <br /> \ :•:'::'::- ' :'::'•+:'•:::::•.-.•.'. rTmax optional : / <br /> :•.. •'. •. •. (2133mm) Y•.Traffic Pad / <br /> •'•- -: �:: . :.'..:.. / MINIMUM BURIAL DEPTH-TRAFFIC LOADS <br /> \/ �::':•:. :.;::::•k.....:.. ...:..::...:: /// • The following burial depths are suitable for <br /> _'..:..'•.:'..' HS20 traffic loads(32,000 lbs/axle), <br /> \ ` `'' \ • The concrete traffic pad, reinforcement and thickness, <br /> All Tank // must be designed for job conditions and traffic <br /> \\\ Diameters : \\/ bads to assure concrete traffic pad integrity. It is <br /> the responsibility of the tank owner or tank owner's <br /> \\\\ \\ representative to design the traffic pad for all loads. <br /> Wet Hole Dry Hole <br /> / • 4'- 10'tanks need a minimum cover depth of <br /> 18"-2a" :.;.:. ;.;:._ 12"-24" �,// 36"backfill or 18"of backfill plus 6"of einforced <br /> (457-610mm) ; (305.610mm) concrete(see Figure G-3). <br /> %Anchor Pad11 AV e's/ /� or W backfiell plus 6'!reinforced cont eteackfill <br /> Figure G-3 <br /> • Traffic pad must extend at least 12"beyond tank rr.1 <br /> perimeter in all directions. 11[l�® <br /> • The maximum burial depth is T from the tank top - 6"Reinf.Concete <br /> (152mm) <br /> to grade elevation.Tanks can be designed for <br /> burial depths greater than 7',contact your local CSI 36"Backfill Min.,* <br /> Min.=: <br /> representative prior to tank purchase. <br /> =i '--.:. .•. c .. <br /> / (914mm) :. 18"Backfill Min. . / <br /> • D hole excavations must have a minimum of 12" (457mm) / <br /> Dry <br /> and a maximum of 24 backfill between the bottom <br /> of the tank and either the bottom of the excavation <br /> or the top of the concrete anchor pad. \/ \\// <br /> • Wet hole excavations must have a minimum of 18" �// Traffic <br /> and a maximum of 24"ball between the bottom \\ <br /> of the tank and either the bottom of the excavation �// 4',6',8', 10' <br /> or the top of the concrete anchor pad. Diameters / <br /> ,g <br />
The URL can be used to link to this page
Your browser does not support the video tag.