Tank Installation (Backfill to Subgrade) <br /> M= <br /> e • Take the Fifth Vertical Diameter Measurement and <br /> record the value on the Tank Installation Checklist <br /> Do not ballast tank until backfill is even with tank (see Figure 1-9). <br /> top or tank damage can occur. <br /> Figure 1-9 <br /> • After backfill is even with tank top,fill all tank Fifth Vertical Diameter Measurement <br /> compartments with ballast to minimize chance of tank <br /> buoyancy. Ful Pipe <br /> • Additional information on alternate installation F't"'9 <br /> techniques is available(see Supplemental Documents, : 2" <br /> Section R). 15 <br /> BACKFILL TO SUBGRADE <br /> • When the tank has been lowered into the excavation <br /> and all testing, backfilling, venting and piping has <br /> been completed; add the remaining backfill material to <br /> subgrade. <br /> • Approved pea gravel or crushed stone must be used <br /> to backfill the tank a minimum of 75% up the side wall <br /> of the tank(s). <br /> • If alternative smaller or finer backfill material is used to <br /> subgrade, geotextile fabric is required <br /> (see Supplemental Documents, Section R). This measurement is taken by: <br /> • Once the tank has been backfilled to subgrade, before 1. Driving a nail into the 1"point at a right angle <br /> placement of concrete pad, take the fourth vertical to the gauge stick. <br /> diameter measurement. 2. Lower the gauge stick down the fill pipe far <br /> • Take the Fourth Deflection Measurement and record enough to extend below the bottom of the fitting. <br /> �v the value on the Tank Installation Checklist 3. Lift the gauge stick until the nail catches on the <br /> (see Figure 1-8). lip of the fitting. <br /> Figure 1-8 4. Read the measurement at the top of the fill pipe. <br /> Fourth Vertical Diameter Measurement 5. Subtract 1"to allow for the point where the nail <br /> is in the gauge stick. <br /> Backfill <br /> Fill Pipe to SubpreCe <br /> • The inner diameter deflection is calculated using the <br /> "Fourth Vertical Diameter Measurement"and <br /> "Fifth Vertical Diameter Measurement". <br /> �i�i • After the final measurement has been recorded, <br /> '; :,:::<:•:: :::::ii��i complete the Vertical Diameter Measurement section <br /> of the Tank Installation Checklist.Verify the values in <br /> �i Table 1-1 have not been exceeded. <br /> • If the final deflection measurement exceeds the <br /> values in Table I-1 you should stop the installation, <br /> prior to pouring the concrete pad, and immediately <br /> contact CSI Tank Technical Support for directions. <br /> \/ \� <br /> Measure from the bottom of the tank <br /> to the top of the fill pipe. <br /> 21 <br />