My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015 AS BUILT PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015 AS BUILT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:13:06 PM
Creation date
11/7/2018 8:23:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015 AS BUILT PLAN
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\AS BUILT PLAN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENLARGED FUEL TANKS PLAN - AS BUILT <br />SCALE: 1/4" = V-0" <br />16' <br />DEADMAN <br />18"X8"X18' <br />(TYP. OF 12) <br />?" PRIMARY <br />SECONDARY <br />3'-0" <br />UG. DIESEL PIPING: <br />F.O.S., _ <br />2" PRIMARY "SMITH' FIBERGLASS <br />3" SECONDARY "SMITH' FIBERGLASS <br />`R INE PUMPS <br />\ 1 <br />I DEA AN TURB E PUMPS <br />12"X12"X16' ( P. SUMP <br />JOF 2 EACH SID v <br />..—.—_ _ - DT -1 __.. _....... <br />U.G. DIESEL PIPING: <br />F.O.S. FROM TANK DT -1, <br />'H N LINE I 3" PRIMARY "SMITH' FIBERGLASS <br />'B RCLASS 4" SECONDARY "SMJTH' FIBERGLASS <br />/ � <br />TURBINE PUMPS <br />SUMP <br />i U.G. DIESEL PIPING: <br />F.O.S. FROM TANK DT -2, <br />3" PRIMARY "SMITH' FIBERGLASS <br />4" SECONDARY "SMITH' FIBERGLASS <br />C'-1 <br />- DT -2 ..........:.... <br />77'-4" <br />OF, 7"ANa' <br />q <br />ti.r" T' ipv`.K <br />i \\ <br />GT-1OF <br />FILL SUMA <br />/ <br />M <br />/ / M <br />FILL SUMP <br />FILL SUMP <br />W-511 <br />3'-0" <br />0 <br />I <br />/ J <br />15/0- <br />/ U.C. VENT PIPING: <br />VENT FROM TANK DT -1 <br />3" PRIMARY "SMITH' FIBERGLASS <br />/ 4" SECONDARY "SMITH' FIBERGLASS <br />U.C. VENT PIPING: <br />VENT FROM TANK DT -2 <br />3" PRIMARY "SMITH' FJBERCLA S <br />4" SECONDARY "SMITH' FIBER ASS <br />U-1=% <br />12340 Santa Monica Blvd. Suite 133 <br />Los Angeles, CA 90025 <br />310/207-8548 <br />Peterson Hydraulics, Inc. <br />1653 W. EI Segundo Blvd., Los Angeles, CA 90249 <br />Phone: (310) 323-3155 Fax: (310) 3233606 <br />License# 631515 w .petersonhydsom <br />"Providing Service To The Vehicle Service Industry" <br />KEY PLAN <br />fFIRE DEPARTMENT <br />SUBMITTAL <br />REVISION BY DATE <br />m AS BUILT DRAWINGS P.N. 081715 <br />SAN JOAQUIN RTD <br />SAN JOAQUIN RTD REGIONAL <br />TRANSIT CENTER <br />ENLARGED FUEL TANKS <br />PLAN - AS BUILT <br />83023.00 <br />AS NOTED <br />17 APRIL, 2014 <br />NORTH FS4.01 <br />\ <br />I <br />U.G. GASOLINE <br />2" P(2lMARY "SMITH' <br />"j "SMITH' <br />VENT PIPING: \ <br />FIBERGLASS <br />\ <br />I <br />SECONDARY <br />FIBERGLASS <br />\ <br />\ \ <br />U.C. GASOLINE PIPING: <br />(1X) F.O.S., \\ <br />U.C. <br />VAPOR RECOVERY PIPING: <br />2" PRIMARY "SMITH' FIBERGLASS \ <br />\ 3" SECONDARY "SMITH' FIBERGLASS \ <br />(1XJ V.R. <br />2 PRIMARY "SMITH' FIBERGLAS <br />\ \ <br />3" SECONDARY "SMITH' FIBERGLASS <br />1 <br />0" <br />\ 1 <br />I DEA AN TURB E PUMPS <br />12"X12"X16' ( P. SUMP <br />JOF 2 EACH SID v <br />..—.—_ _ - DT -1 __.. _....... <br />U.G. DIESEL PIPING: <br />F.O.S. FROM TANK DT -1, <br />'H N LINE I 3" PRIMARY "SMITH' FIBERGLASS <br />'B RCLASS 4" SECONDARY "SMJTH' FIBERGLASS <br />/ � <br />TURBINE PUMPS <br />SUMP <br />i U.G. DIESEL PIPING: <br />F.O.S. FROM TANK DT -2, <br />3" PRIMARY "SMITH' FIBERGLASS <br />4" SECONDARY "SMITH' FIBERGLASS <br />C'-1 <br />- DT -2 ..........:.... <br />77'-4" <br />OF, 7"ANa' <br />q <br />ti.r" T' ipv`.K <br />i \\ <br />GT-1OF <br />FILL SUMA <br />/ <br />M <br />/ / M <br />FILL SUMP <br />FILL SUMP <br />W-511 <br />3'-0" <br />0 <br />I <br />/ J <br />15/0- <br />/ U.C. VENT PIPING: <br />VENT FROM TANK DT -1 <br />3" PRIMARY "SMITH' FIBERGLASS <br />/ 4" SECONDARY "SMITH' FIBERGLASS <br />U.C. VENT PIPING: <br />VENT FROM TANK DT -2 <br />3" PRIMARY "SMITH' FJBERCLA S <br />4" SECONDARY "SMITH' FIBER ASS <br />U-1=% <br />12340 Santa Monica Blvd. Suite 133 <br />Los Angeles, CA 90025 <br />310/207-8548 <br />Peterson Hydraulics, Inc. <br />1653 W. EI Segundo Blvd., Los Angeles, CA 90249 <br />Phone: (310) 323-3155 Fax: (310) 3233606 <br />License# 631515 w .petersonhydsom <br />"Providing Service To The Vehicle Service Industry" <br />KEY PLAN <br />fFIRE DEPARTMENT <br />SUBMITTAL <br />REVISION BY DATE <br />m AS BUILT DRAWINGS P.N. 081715 <br />SAN JOAQUIN RTD <br />SAN JOAQUIN RTD REGIONAL <br />TRANSIT CENTER <br />ENLARGED FUEL TANKS <br />PLAN - AS BUILT <br />83023.00 <br />AS NOTED <br />17 APRIL, 2014 <br />NORTH FS4.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.