My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2300 - Underground Storage Tank Program
>
PR0231158
>
REMOVAL_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 2:44:48 PM
Creation date
11/8/2018 9:35:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2014
RECORD_ID
PR0231158
PE
2361
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LINDSAY\1533\PR0231158\REMOVAL 2014.PDF
QuestysFileName
REMOVAL 2014
QuestysRecordDate
3/25/2016 4:38:22 PM
QuestysRecordID
3031124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Environmental Health Department DIRECTOR <br />1868 E. Hazelton Avenue Donna Heran, REHS <br />Stockton, California 95205-6232 PROGRAM <br />COORDINATORS <br />Robert McClellon, REHS <br />Website: www.sjgov.org/ehd Jeff Carruesco, REHS, RDI <br />Phone: (209) 468-3420 Kasey Foley, REHS <br />Fax: (209) 464-3433 Linda Turkatte, REHS <br />APPLICATION FOR UNDERGROUND STORAGE TANK <br />CLOSURE PERMIT <br />GENERAL INSTRUCTIONS: <br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br />adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, buildings, <br />underground public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from <br />tank to dispensers. If underground utilities are not included on the site map, you must state in writing that USA <br />Dig will be contacted prior to excavation activities. <br />[ ] 3. Complete pages 3-5, "Application for Underground Storage Tank Closure Permit". ER. Samoling firm <br />shall be an independent third Party from the contractor. <br />[ ] 4. Complete page 8, "Authorization to Release". This form must be signed and dated by the <br />OWNERIOPERATOR of the facility. <br />[ ] 5. Submit a "Service Request" form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br />(formerly State A & B forms) and complete the "Underground Storage Tank Program Fee Worksheet". <br />[ ] 6. Complete all questions on page 9, the Environmental Health Department (EHD) "Underground Storage Tank <br />Disposition Tracking Record", except those requiring a signature and date of tank removal The holder of the <br />permit shall be responsible for ensuring that this form is completed and returned to EHD within 30 days of the <br />tank removal. <br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards for <br />this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the <br />County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the <br />Uniform Building Code STD 70-11. <br />[ ] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to the Environmental <br />Health Department (EHD) approval of the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br />plan. If gross deficiencies are identified, an addendum will be required with a $125.00/hour fee and the review will <br />begin on the date of resubmittal. <br />[ ] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />[ ] 12. Advance inspection notice of at least 48 hours is required by EHD. <br />(] 13. If planning to over -excavate at time of UST removal, see "III. SITE MITIGATION" on Page 2. <br />EH 23 046 (Revised 10/30/12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.