My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 2:28:08 PM
Creation date
11/8/2018 9:36:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO 1998-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAdW COUNTY ENVIRONMENTAL HEALTH fleffARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN -PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN A 2.CHANGE OF INFORMATION Mat. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mai <br /> (Cbmk one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> U'. l. <br /> FACII,TCY NAME A Casd) No— '-�4 (05 Mm. <br /> FACILITY SITE ADDRESS •l c W t �LQ, =CITY Lod Mos. <br /> U. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is mine frequent. Such work=9 be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan most include a Site Plan showing the general lank and piping layouts it the locatims where monitoring is performed(i.e.,location of each sensor, <br /> line leak detecmr,monitoring system cmtml panel,etc.). Ifyou already have a diagram(e.g.,c rent UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hagmdms Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) him <br /> 1.CONTINUOUS ELECTRONIC MONITORING{'OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: K a pDDRY l❑ b.LIQUID FILLED El e.UNDER PRESSURE ❑ d UNDER VACUUM <br /> PANEL MANUFACTURER: VQ2f(fi, RUScT M12 MODEL#: SLS M13, <br /> LEAK SENSOR MANUFACTURER: ()QQC(QI— P,0.�+ 1414. MODEL#(S): 7 `N390-q Mls. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKlS) <br /> PANEL MANUFACTURER: M16. MODEL#: Mn. <br /> IN-TANK PROBE MANUFACTURER: Mtg. MODEL#(S): NIM <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY Rrto' <br /> ❑ d MONTHLY ❑ e.OTHER(Specify): M31, <br /> PROGRAMMED TESTS: ❑ a 0.1 g.p.b. ❑ b.02 g p.h. ❑ c.OTHER(Specify): Mzx MTS. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M}A. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Mza. MTI. <br /> ❑ 6.VLSUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(R.yocmegng ggeove) <br /> ❑ 99.OTHER(Specify): M2R <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) we <br /> L CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 16 a DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANELMANUFACIURER: Uayi4e, Rao+ nuz MODEL N: TLS MJi <br /> LEAK SENSOR MANUFACTURER: 79ti -690 -a0i? MJO MODEL#(S): M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(Le.,TURBINE)SHUTDOWN? Cg'&YES ❑ b.NO M]a <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN9 a a YES ❑ b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETEgEFDd, � <br /> MLLD MANUFACTURER(s): Rp. A(X-H Q- t'O& MODEL#(S): .F i,) U , F W9. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Mia MODEL#: M61 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. raz <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO W3 <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO M14' <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mas' Mab. <br /> ❑ 5.VLSUAL MONITORING DONE: ❑ aDAILY ❑ b.WEEKLY* ❑ c.MEN.MONTHLY&EACH TIME SYSTEM OPERATED*' Mai. <br /> .Ryo'am a,nn,n,,nnn l ••Ml farmmimring ofmbmid mwBm gB nr incl piping miyP HSC§-5]815(bX]) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> ".OTHER(Specify) M4N' <br /> STCEBDd(07/03)-1/4 07/23103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.