Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> ►TankWilogy <br /> 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2243688 <br /> TEST DATE: 07/05/06 AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: USA PETROLEUM SITE: USA #65 (N-903) <br /> TANK INFORMAT, <br /> Tank ID: 12K 2 Tank manifolded: NO Bottom to top fill in inches: <br /> Product: PLUS Vent manifolded: No Bottom to grade in inches: <br /> Capacity in gallons: 12,032 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 389 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST.RESULTS Test Method: LEAK DETECTOR TEST RESULTS Test method:'„. <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JACKET <br /> Fluid volume in gallons: Model: Px1V <br /> Tank water level in inches: S/N: 0213 <br /> Test time: NOT Open time in sec: 3.00 <br /> Number ofthermisters: TESTED Holding psi: 12 NOT <br /> Specific gravity: Resiliency cc: 125 TESTED <br /> Water table depth in inches: Test leak rate in!"In: 189.o <br /> Determined by(method): Metering psi: 6 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTest Method: LINE TEST RESULTS Test type: <br /> Test time Material: ENVIRON <br /> Ullage volume: Diameter(in): 1.5 <br /> Length(ft): 120.0 <br /> Ullage pressure: Test psi: <br /> Results: Bleedback cc: <br /> Test time(min): <br /> DATA FOR UTS-4T ONLY: Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 07/12/2006 10:38 SBOWERS <br />