My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 2:28:08 PM
Creation date
11/8/2018 9:36:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO 1998-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mor <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME Mm. <br /> FACILITY SITE ADDRESS Mia. CITY Mos. <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)be performed in Mue_ <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ❑ L ANNUALLY ❑ 99.OTHER(Specify): M07 <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Ilazardous Materials Business Plan map,etc)which shows all required information,include it with this plan. <br /> MONITORING IS PERFORMED USINGHE FOLLOWING METHOD(S):(Check all that apply) MID. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MI1. <br /> PANEL MANUFACTURER: M" MODEL MODEL#: M13. <br /> LEAK SENSOR MANUFACTURER: M14. MODEL#(S): MIs. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL NK(S) <br /> PANEL MANUFACTURER: MI6. MODEL#: MIT <br /> M-TANK PROBE MANUFACTURER: MIa. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M2ir <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): Mer <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. W3. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS Ws <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27, <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Rinion s-gooey appmveb <br /> ❑ 99.OTHER(Specify) Mea. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)ARENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c UNDER PRESSURE ❑ d.UNDER VACUUM Mar. <br /> PANEL MANUFACTURER: Maz MODEL#: M33. <br /> LEAK SENSOR MANUFACTURER: Mia MODEL#(S): M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO Mae, <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Ma" <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): Mas. MODEL#(S): Mas <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M4D. MODEL#: Mal. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MIMMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. Maz <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Moa <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mats M46 <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M49. <br /> •Requireaagene,approval *•Mlox for morning of wbunMemergenrygenauorfud pip,only per HSC 4252/21.5(6X3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) ' <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M4e. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.