Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> TEST DATE: 07/05/06 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER: 2243688 <br /> AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: USA PETROLEUM SITE: USA #65 (N-903) <br /> CIL TANK INFORMATION <br /> Tank ID: 6K 4 Tank manifolded: No Bottom to top fill in inches: <br /> Product: DIESEL. Vent manifolded: No Bottom to grade in inches: <br /> Capacity in gallons: 6,016 Vapor recovery manifolded: No Fill pipe length in inches: <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 195 Overspill protection: YES Stage I vapor recovery: NONE <br /> Material: DW STEEL Installed: ATG Stage II vapor recovery: NONE <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST.RESULTS Test Method: 'LEAK DETECTOR TEST RESULTS Test method: I' <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JACKET <br /> Fluid volume in gallons: Model: ext-DV <br /> Tank water level in inches: S/N: 8129 <br /> Test time: NOT Open time in sec: 3.00 <br /> Number ofthermisters: TESD Holding psi: 12 NOT <br /> Specific gravity: Resiliency cc: 50 TESTED <br /> Water table depth in inches: rest leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 8 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTest Method: LINE TEST RESULTS Test type: <br /> Test time: Material: ENVIRON <br /> Ullage volume: Diameter(in): 1.5 <br /> Ullage pressure: Length(ft): 80.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> Test time(min): <br /> DATA FOR UTS-4T ONLY: <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 07/12/2006 10:38 SBOWERS <br />