Laserfiche WebLink
S WRCB January,2002 • • Page of_ <br /> 7. UNDER-DISPENSER CONTAINMENT C)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer. <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?. ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: L)Pass ❑Fail ❑ ❑Pass ❑Fail r ❑Pass ❑Fail ❑ ❑Pass ❑Pail d <br /> Was sensor removed for testing? ❑Yes ❑ No ❑NA ❑Yes _❑ No ❑ N_A_ ❑_Yes ❑ No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ❑Yes ❑ No ❑NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑NA ❑Yes ❑No ❑ NA <br /> Comments—(include information on repairs made prior to testing,and recommended fallow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested If the answer to any of the questions indicated with an asterisk <br /> (')is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />