Laserfiche WebLink
F. In-Tank Ganging/SIR Equipment: Q Check this box if tank gauging is used only for inventory control. <br /> Q Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform lea"C -Lection motlitoring. <br /> Complete the fellowing checklist: / ! <br /> ❑ Yes Q Nos flus all input wiring t inspected Cor propaentry-amiCee.�auon,including testing for gotmd faults? <br /> ❑ Yes D No* Were all rank gmgmg prohm vismlly for damage and residue Holdup? <br /> Q Yes 10 No- Was accuracy of system product readings tested? <br /> Q Yes Q No* Was accuracy of systemreadings tested? <br /> 0 Yes Q No* <br /> Were all probes ed properly? <br /> Q Yes Ll No* W ere alt i on the equipment manufactmner's ttmil itrasurs checklist completed? <br /> *In the Section S,bele how and when these deficiencies were or will be corrected. <br /> G. Lia C6eetotS 0"): 0 Check this box if LLDs are not installed- <br /> Complete <br /> nstalled.C tete the following checklist <br /> lzyes Q No* For egmpm m sten-op or annual equipment ceridii®tion, was a leak simulated to verify LLD performance? <br /> Q NIA (Check aO that apply) Simulated leak ratet$3 g.ph: Q 0.t g.p.h: Q 02 g p.b. <br /> _ es ❑ No* Were all LLDs confirmed optxauonal and actuate within regulatory requrremena? <br /> FF-'P 3 No* Was the testing apparatus propedycalibrated? <br /> es Q No* For mechanical LLDs,does the LLD restrict prod»aflow d it detects a leak' <br /> Ll NIA <br /> ❑ Yes Q No* Foreleetrumc:LLDs.dans the turbine automatically shut ofCif the LLD detects a leek? <br /> ❑ NIA <br /> Q Yes Q No* For electronic I Ds,does the turbine automatically shot off if any portion of the monitoring system is disabled <br /> Q NIA or duonuecti:V <br /> ❑ Yes Q No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 0 N/A or fails a test? <br /> Q Yes Q No* For electronic UDs.have all accessible wiring connections been visually inspected? <br /> Q N!A <br /> Yes Q No* Were all items on the ewpineuf manufacturers Mainttamxe checklist completed? <br /> *In the Section T3,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 0310: <br />