Laserfiche WebLink
SWRCB,January 2002 • • Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: Q Spill Bucket Manufacturer LE Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: I Equipment Resolution: <br /> Spill Box# 87 Spill Box# 89 Spill Box# 91 Spill Box# dsl <br /> Bucket Diameter: 14 14 14 14 <br /> Bucket Depth: 12 12 12 12 <br /> Wait time between applying <br /> pressure/vacuum/water and 30 30 30 30 <br /> starting test: <br /> Test Start Time: 1000 1000 1000 1000 <br /> Initial Reading(Rt ): =P1 <br /> 8 8 8 <br /> Test End Time: 1100 1100 1100 <br /> Final Reading(RF ): 8 8 8 <br /> Test Duration: 1 hr 1 hr 1 hr <br /> hange in Reading(R F0 0 0 <br /> asail Threshold or0 0 0 <br /> Criteria: <br /> � e <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />