Laserfiche WebLink
Altoring System Certification • <br /> Site Address: 2500 W. LODI AVE. Date of Testing/Service: 07/05/2006 <br /> @ LOWER SACRAMENTO RD. <br /> F. In-Tank Gauging I SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> X❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> M Yes ❑No' Was accuracy of system product level readings tested? <br /> QYes ❑No' Was accuracy of system water level readings tested? <br /> X Yes ❑No* Were all probes reinstalled properly? <br /> QYes ONO• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No• ❑N/A (Check all that apply)Simulated leak rate: ❑X 3 g.p.h ❑0.1 g.p.h 00.2 g.p.h <br /> X Yes ❑No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> f_X-1 Yes ❑No' Was the testing apparatus properly calibrated? <br /> ❑X Yes ❑No* ❑WA For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> ❑Yes ONO* 0 N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No' M N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ON,' Q NiA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No' X❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> pumped out 5 gals of water from fill sumps <br /> 87 and 89 annular sensors have cats ethernet wire installed in order to extend them. proven functional but incorrect wire,sandy <br /> edwards will make sure it is repaired correctly <br /> Page 3 of 3 Based on CA form dated 03/01 <br />