Laserfiche WebLink
SWR(fB,January 2002 • • Page 2 <br /> 9. SP[LUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: ❑ <br /> Test Method Developed By: F-1 Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 87 Spill Box# 89 Spill Box# 91 Spill Box# dsl <br /> Bucket Diameter: 14 14 14 14 <br /> Bucket Depth: 12 12 12 12 <br /> Wait time between applying <br /> pressure/vacuum/water and 30 30 30 30 <br /> starting test: <br /> Test Start Time: 1000 1000 1000 1000 <br /> Initial Reading(Rt ): 8 8 8 8 <br /> Test End Time: 1100 1100 1100 1100 <br /> Final Reading(RF ): 8 8 8 8 <br /> Test Duration: i hr 1 hr 1 hr 1. hr <br /> Change in Reading(R F Rt ) 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: O Pass D Fail 0 Pass El Fail ]Pass El Fail Pass 1:1 Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />