My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 2:28:08 PM
Creation date
11/8/2018 9:36:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO 1998-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUW STORAGE TANK MONWORING PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> M01. <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> Moz. <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - <br /> Mm. <br /> FAC LITY NAME USA GAS#65 <br /> FACILITY SITE ADDRESS 2500 W. LODI AVE. Mot, CITY LODI M05. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. Mol. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mw. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERS'T'ITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M° <br /> PANEL MANUFACTURER: VEFFIFR ROOT Mlz MODEL#: TI S350 M13. <br /> LEAK SENSOR MANUFACTURER: <br /> \/FEDFR ROOT _ M14. MODEL#(S): I S3 MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) MIT <br /> PANEL MANUFACTURER: MODEL#: <br /> w <br /> o. <br /> IN-TANK PROBE MANUFACTURER: MIB. MODEL#(S): <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS E] R. <br /> b.DAY/NIGHTLY [I C.WEEKLY 1'r2°. <br /> ❑ d.MONTHLY <br /> El c.OTHER(Specify): M23. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. C] c.OTHER(Specify): M22. Mz3. <br /> C] 3.INVENTORY RECONCILIATION E] a MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24' <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M2'6' <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a ANNUALLY E] b.BIENNIALLY E] c.OTHER(Specify): Mz7. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Ralulresage approval) <br /> Mze. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> M30. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> ® L CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)rFRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ a UNDER PRESSURE ❑ d.UNDER VACUUM ADI. <br /> PANEL MANUFACTURER:VFFDFRROOT _ M32. MODEL#: TLS 350 W3. <br /> LEAK SENSOR MANUFACTURER: <br /> \/FFDFR ROOT M34. MODEL#(S): 908 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a YES ® b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ® b.NO W7. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED Noy <br /> MLLD MANUFACTURER(s):RFD JACKET blla. MODEL#(S): FX1V FX1DV <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> Mao. MODEL#: M4 1. <br /> ELLD MANUFACTURER: <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a MINIMUM MONTHLY 0.2 g.p.h. [Ib.MINIMUM ANNUAL 0.1 g.p.h. M4z. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> M45. M46. <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a DAILY ❑ b.WEEKLY* ❑ a MIN.MONTHLY&EACH TINE SYSTEM OPERATED" M47. <br /> *RwOu'veseg yspprovel •'Allowed Por monitoring ofuMuried emergenncy gmmwr fuel piping only Per HSC§25281.5(bX3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> Mas. <br /> ❑ <br /> 99.OTHER(Specify) <br /> UN-022A-115 www.unidoes.org Rev.10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.