My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 2:28:08 PM
Creation date
11/8/2018 9:36:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO 1998-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> I►Tanknobgy <br /> TEST DATE:10/04/05 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER2238773 <br /> CLIENT:USA PETROLEUM AUSTIN,TEXAS 78759(512)451-6334 SITE:DSA #65 <br /> Tank ID: 6K 3 Tank manifolded: No Bottom to top fill in inches: <br /> Product: PREMIUM Vent manifolded: NO Bottom to grade in inches: <br /> Capacity in gallons: 6,016 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 56.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 155 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DN STEEL Installed: ATO Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> . .. _ _.... <br /> `C3:._ O ST-RESULTS Test method:FTA <br /> Dipped Water Level: Start(in) End(in) New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Product Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Probe Water Level: Make: RED JACKET <br /> Ingress Detected: Water Bubble Ullage Model: FK1V <br /> S/N: 3359 <br /> Test time: <br /> IOpen time in sec: 4.00 <br /> Inclinometer reading: <br /> Holding psi: 12 <br /> VacuTect Test Type: NOT Resiliency cc: 105 NOT <br /> VacuTect Probe Entry Point: TESTED Test leak rate ml/m: 185.0 TESTED <br /> Pressure Set Point: Metering psi: 10 <br /> Tank water level in inches: Calib. leak in gph: 3.00 <br /> Water table depth in inches: Results: PASS <br /> Determined by(method): <br /> Result: COMMENTS <br /> COMMENTS <br /> -;- LINE TEST RESULTS ?`I. Test type: TLD-1 <br /> LINE A B C <br /> Material: ENVIRON <br /> Diameter(in): 1.5 <br /> Length (ft): 120.0 <br /> Test psi: <br /> Bleedback cc: <br /> Test time (min): NOT NOT NOT NOT <br /> Start time: TESTED TESTED TESTED TESTED <br /> End time: <br /> Final gph: <br /> Result: <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 10/12/2005 07:20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.