My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step#2—Sand and Clean Mating Surt <br /> Use the supplied sandpaper(60grit)tos area around the drilled Fieldinstalle Coupling Used With Fiberglass <br /> hole on both the inside and outside of the tu a enclosure.The turbine P 9 g ass <br /> enclosure surface must be sanded"white"toensure proper bond;the Double Wall Pipe <br /> sanded area should radiate at least 3"out from the hole edges.Also, <br /> sand the FRP fitting flanged surfaces.Use a clean,drycloth to remove Turbine Enclosure Interior <br /> sanding dust;if the surfaces are contaminated with grease or piping Female Section /Male Section <br /> dope,use clean solvent to thoroughly clean the bonding surfaces and Fiberglass t \ <br /> then resand the surfaces. g <br /> Secondary Pipe <br /> �Sand inner surface of <br /> Fiberglass coupling <br /> oand outer <br /> Field Installed FRP Coupling Primary Pipe glass <br /> pipe. <br /> Apply adhesive to <br /> Turbine Enclosure Interior inside surface of FRP <br /> t Adhesive Fill_ coupling and outside <br /> surface of FRP pipe <br /> t just before final <br /> Female Section Male Section' assembly. <br /> D Sand these surfaces first, Field Installed FRP Coupling Used With HDPE <br /> then apply adhesive to P 9 <br /> thesesudacesjust before Secondary Containment System <br /> final assembly. <br /> Turbine Enclosure Interior <br /> 'Male section to be inserted Female Section <br /> t from the inside of the Fiberglass Pipe Stub Male Section <br /> turbine enclosure. <br /> D Send inner sur. <br /> face of 3"FRP <br /> Step#3—Mix and Apply Adhesive Fiberglass coupling and <br /> Before mixing or applying the adhesive,confirm that the bonding sur- Primary Pipe outer surface of <br /> FRP pipe. <br /> faces of the turbine enclosure and the FRP coupling are dry and clean. HDPE Secondary Apply adhesive to <br /> Then,thoroughly mix the two.part adhesive in accordance with the detail- Containment System inside surface of <br /> ed mixing instructions contained in the adhesive kit. Stainless steel Adhesive Fill, FRP coupling and <br /> Apply the adhesive with the supplied putty knife to the prepared surfaces Hose Clamp outside surface of <br /> on both the Fiberglas turbine enclosureajust before final <br /> the FRP fitting flanges.All FRP pipe stub <br /> surfaces must be dry before applying the adhesive.Since the adhesive is assembly. <br /> temperature sensitive,follow the Adhesive Application Guidelines in <br /> section G5. <br /> Step#a—Attach FRP Coupling Field Installed Rubber Grommet Used With Fiberglass <br /> Insert the male threaded coupling section from theinside of the turbine Double Wall Pipe <br /> enclosure.And screw the female threaded section from the outside of the <br /> turbine enclosure.Then tighten down both sections by hand tightening TurbineEnclosure Interior <br /> until the adhesive is squeezed out from the flange faces.Use the flat Stick Rubber Grommet '. <br /> or puny knife to fill in all gaps around the coupling flange and turbine <br /> enclosure wall. Fiberglass ` <br /> Step#5—Curing Secondary Pipe <br /> Allow a minimum of four hours for the adhesive to harden completely.The <br /> mating parts must not be moved before the adhesive is fully cured. Fiberglass <br /> For outside ambient temperatures below 60 OF,supplemental heat is Primary Pipe <br /> required to initiate the adhesive curing process(See Adhesive Applica- <br /> tion Guidelines in section G6). j <br /> After a successful test(see section G7)of the coupling is completed,the <br /> secondary piping can be installed onto the FRP coupling. <br /> H5. Secondary Piping Connection Field Installed Rubber Grommet Used With HOPE <br /> The two most commonly used methods to secondarily contain piping are Secondary Containment System <br /> double-wall fiberglass pipe and HDPE secondary containment system. e Enclosure <br /> in <br /> Fiberglass pipe manufactured by Smith Fiberglass and Ameron are Turbine <br /> dimensionally compatible with the FRP coupling. Rubber Grommet <br /> or <br /> Follow the secondary piping manufacturer's installation instructions for Fiberglass Pipe Stub <br /> proper installation methods.Typical methods to attach the secondary <br /> \_c I <br /> piping are shown in the following drawings: <br /> Fiberglass <br /> Primary Pipe <br /> HDPE Second <br /> Containment System <br /> Stainless Steel Hose Clamp <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.