My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• s <br /> Inspection, handling and storage <br /> 3 Inspection <br /> 3 Handling and storage <br /> Materials requirements <br /> 3 Pipe <br /> 3 Adhesive <br /> Field cutting and tapering <br /> 4 Cutting <br /> 4 Tapering <br /> 4 Taper Maker <br /> Bell and spigot joining system <br /> 6 Joint preparation <br /> 6 Mixing the adhesive <br /> 6 Applying the adhesive <br /> 7 Making(stabbing)the joint <br /> 7 Curing the adhesive <br /> 8 Using the Chem Cure Pak <br /> 8 Using the heating blanket <br /> • 9 Insulating the joint <br /> NPT threaded connections <br /> 10 Thread preparation <br /> 10 Making the joint <br /> Pipe installation <br /> 10 Bedding, backfilling and covering <br /> 10 Burial depth <br /> 11 Trench width <br /> 11 Pipe protection <br /> 11 Supporting valves and accessories <br /> 11 Connecting to fittings <br /> 12 Precise alignment and make-up <br /> 12 Pipe testing <br /> Repairs <br /> 13 Extensive damage <br /> 13 Minor damage <br /> Typical installations <br /> 14 Dualoy 300011-product/vapor recovery system <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.