Laserfiche WebLink
3" & 4" ASSEMBLY Apply a uniform heavy-coating to all flat, sanded sealing surfaces, the sanded end <br /> WITH C20HT of the Containment pipe and to the sanded radius of the fitting where the pipe <br /> will fit. Carefully put the Containment fitting around the Containment pipe. Make <br /> sure it is not cocked or crooked. Apply extra adhesive along each side of each pipe <br /> leg when it is placed into the bottom half of the fitting, before putting the top half <br /> in place. Tighten the nuts and bolts in steps to bring the mating surfaces together <br /> evenly. Bring the nuts and bolts on the inside radius of the elbows and tees down <br /> first before tightening completely the nuts and bolts on the outside straight flanges. <br /> Do not attempt to move the Containment piping during or after curing of the <br /> adhesive as it may cause leaks. <br /> 6" ASSEMBLY Apply a uniform thickness of at least 118 inch to all flat, sanded sealing surfaces, <br /> V= SC-10 the sanded end of the Containment pipe and to the sanded radius of the fitting <br /> where the Containment pipe will fit. Assembly after application of the SC-10 is <br /> the same as stated above for C20HT. <br /> • <br /> If the temperature is below 40°F, the Containment pipe and Containment fittings <br /> should be warmed to at least 70°F prior to applying the warmed adhesive. <br /> Number of two piece fittings that can be joined per adhesive kit <br /> C20HT (6.8 oz) 90k 45s Tees Conc. Red. Saddles Couplings <br /> • <br /> 3" 4 4 3 4 15 4 <br /> 4" 4 . 4 3 4 10 3 <br /> SC-10 (6.8 oz) <br /> 6" 1 1 1 1 1 1 <br />