Laserfiche WebLink
�EQW <br /> 2814 McCracken Avenue Muskegon, MI 49441 (616) 755-1671 <br /> 705-GL (15 Gallon) LUxcatchTm Spill Containment Manhole <br /> INSTALLATION INSTRUCTIONS : PLEASE READ BEFORE INSTALLING <br /> Before installing Flex Catch, coat all riser pipe threads with a thread sealant that is compatible with the <br /> product to be contained. <br /> Install Flex Catch by threading onto tank riser pipe until hand-tight.Caution:Do not use upper cast iron ring <br /> to fully tighten Flex Catch.Tightening the tank using the upper cast iron ring can cause undue stress to the <br /> entire unit. <br /> To finish tightening,place a pipe wrench on the round surface of the lower 4"threaded fitting and tighten. <br /> If space is limited (ie: Retrofit installation to a sawed out section of concrete) <br /> 1) Make sure that the inside riser pipe is removed. <br /> 2) Locate the fitting that the inside riser pipe threads into. <br /> 3); Coming down through the top of the unit,use a special socket wrench on the octagonal surface of <br /> that fitting to finish tightening. Do not disassemble unit. <br /> • Top edge of rim must be positioned a minimum of 2" above driveway level to provide an adequate slope for <br /> drainage. <br /> To raise Flex Catch tank height and hold in'place,use the 11-3/4"x 1-3/4"x 3/4"wood block that is shipped with <br /> �• each tank. Insert it underneath the cast lugs located inside the tank on the iron ring, and add shims between <br /> that and the adaptor for desired height. (See Figure A) <br /> • If Flex Catch needs to be lowered,then add weight to the top of the lid to hold down in place. <br /> CAUTION: These adjustments will allow only up to 1-1/2"of movement up or down for final grade adjustment. If <br /> more adjustment is needed,then a shorteror longer riserpipe must be used between the underground storage tank <br /> and the base of the Flex Catch. <br /> • Before pouring cement, place duct tape around the rim, this will keep the cement out of the drainage grooves <br /> when the lid is in place. See figure B. After cement has solidified, remove duct tape and any excess cement. <br /> Note :Drain valve assembly is 705-311-02(Replacement part). Plate assembly kit is 705-122-01 (to seal off <br /> drain). <br /> CHECK FOR LEAKS <br /> Every unit should.be tested for leaks prior to, and after pouring the concrete. If this model <br /> comes with a drain, close it. If not, install 705-120-02 test plug. Fill the unit completely with <br /> water. If the test water level drops at all within one hour, then a leak exists. <br /> Checkto see that the drain valve is seating properly. If not,then pull the drain valve several <br /> times. Replace the valve if it continues to leak. <br /> If the unit continues to leak,the entire spill container should be removed from the riser pipe <br /> and replaced with another. RE-TEST. <br /> • After the concrete has been poured, RE-TEST to make sure that no damage occurred <br /> during installation. <br /> Drawings on Back <br /> 6.1990 EBW,Inc.•7/90•Forrn 7278A <br />