Laserfiche WebLink
3 <br /> qlift <br /> c <br /> p <br /> i <br /> 1 . <br /> 't y lI 4 <br /> i <br /> r "' s <br /> 3✓ r <br /> .�- �12 -x•�-" �� �„s Y <br /> 15 . F =� <br /> I <br /> i <br /> E <br /> i - <br /> ..:i, <br /> l • Optional Accessories <br /> ;?�_ •• ,-V,,_ Supplied by Your Local <br /> Petroleum Distributor: <br /> y 9 Overfill Spill Container <br /> Contains delivery hose con- <br /> - ` tents if the tank is overfilled. <br /> "a •e'er' Containment Collar 10 Overfill Shut-Off Switch <br /> ae ?' <br /> Sensor Prevents product from backing <br /> 4 "'y This float switch se aratel up into vent and vapor lines if <br /> P y the tank is overfilled. <br /> k ° monitors the containment <br /> collar which is isolated from 11 Submersible Pump <br /> itch Panel the tank monitoring system. 12 Fill Tube <br /> ,A switch panel expands the 7 Turbine Enclosure 13 Dispenser <br /> :- monitoring capability of each Provides a termination point14 Double-Wall Fiberglass <br /> monitoring circuit in the elec- for electrical connections and pipe <br /> tronic control panel to two double-wall piping. An optional P <br /> sensors. adhesive kit is available to seal 15 Electronic Inventory <br /> the turbine enclosure to the Gauge <br /> 5 Secondary Containment <br /> Collar containment collar to Monitors level in the prevent P <br /> This device provides second- <br /> the ingress of groundwater. primary tank. <br /> ary containment of piping 8 Fitting Kits for Turbine <br /> 'Typical double-wall lank installation with double. <br /> leaks and the submersible Enclosure wall piping on the product lines,lankmrerlillpre- <br /> pump. The collar must be Optional field-installed fitting tank ontlpiping montorn,overspill aing nt,and independent <br /> electronically monitored to kits are available for piping <br /> detect the accumulation of and electrical connections to Note:Always consult local codes for specific <br /> piping detail.Other restrictlons may apply <br /> leaked product. the turbine enclosure. to venting,filling•and vapor recovery <br /> 5 <br />