My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Made To-Ordef • Made-To-Order Tank Notes <br /> Double-Wall Tanks 1.The location of additional <br /> and/or modified tank acces- <br /> sories should be referenced <br /> by the numbered fitting <br /> position between ribs. <br /> 2. Fittings cannot be installed <br /> in locations marked with an <br /> asterisk ('). <br /> 3. Standard pipe fittings to the <br /> primary tank are 4" NPT <br /> half couplings. All tanks <br /> require at least one manway. <br /> The manway cover should <br /> include at least one fitting. <br /> 4. Specifying more or larger <br /> manways than the standard <br /> Additional Made To- Monitoring capabilities— double-wall tank may alter <br /> Order Double-Wall the following restrictions apply the anchoring strap locations. <br /> Tanks with Suggested for the various types of double- The standard anchoring <br /> Fitting Locations wall tank monitors: strap locations are indicated <br /> by arrows. <br /> Although the standard double- a) Hydrostatic Tank Monitor— <br /> wall tanks are designed to tank burial depth must not 5. All additional manway <br /> accommodate storage app <br /> wall <br /> exceed 7 from tank top to covers should include at <br /> cations, most tanks can be finish grade. least one fitting to facilitate <br /> modified to include larger or future volumetric precision <br /> additional manways or tank- The monitoring cavity must be tank testing. <br /> mounted fittings or other vented to the atmosphere. The <br /> optional reservoir sensor, sup- 6. Tank bottom deflector plates <br /> double-wall tank accessories. ,1 <br /> plied by O/C TANKS, is also are standard under every <br /> Modified standard tanks accessories. <br /> Jl <br /> made-to-order tanks require designed to automatically vent manway and fitting. <br /> additional lead time for the monitoring cavity. <br /> production. 7. All Model "P" tanks <br /> b) Liquid sensors—when include a Fiberglas reser- <br /> The made-to-order tanks are cavity monitors which voir integrally constructed to <br /> shown with manways and detect the presence of a the tank top at the locations <br /> tank-mounted fittings in the liquid are used, the cavity noted in the standard tank <br /> suggested positions. between the inner and drawings. The reservoir <br /> outer tank may be either includes one 4 NPT half <br /> vented to the atmosphere coupling fitting (6" NPT fit- <br /> or sealed. ting for 10' diameter tanks) <br /> mounted on the top of the <br /> c) Vacuum monitoring—when reservoir allowing access to <br /> vacuum monitoring is used, the cavity between the inner <br /> the maximum vacuum is 3" and outer tank walls. <br /> mercury (1.5 psi maximum). <br /> Tank burial depth must not 6. In addition to the monitor- <br /> exceed three feet. ing fitting located in the <br /> Fiberglas reservoir, tanks <br /> d) Positive air pressure—when 4000 gallon capacity and <br /> positive air pressure moni- larger include one addi- <br /> toring is used,the maximum tional monitoring fitting <br /> air pressure is 3 psi. (4" NPT) located at the <br /> tank top near the manway. <br /> e) Gasoline vapor sensors— <br /> when gasoline vapor <br /> sensors are used, the <br /> cavity between the inner <br /> and outer tank may be <br /> either vented to the <br /> atmosphere or sealed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.