Laserfiche WebLink
P. Fiberglas A*ment U. Fittings Threaded—No 6. Location <br /> Rings 1. All threaded fittings o Refer to drawings for <br /> Shall be constructed of labeled tanks for storage of location. <br /> minimum 1/4" thick petroleum products shall 7. Suction line <br /> Fiberglas materials and be located in a manway lid Shall be installed on site by <br /> surface mounted to the or a tank mount within 12" the contractor. Diameter of <br /> tank top around existing of the tank top center line pipe and grade and sched- <br /> manways. The 30" ID and be constructed consis- ule as called out in other <br /> Fiberglas attachment ring tent with the requirements sections. <br /> is used in conjunction with of the U.L. label. Fittings to 6, Return Line <br /> a 22" ID manway. The 42" be supplied with threaded Shall be installed on the <br /> ID Fiberglas attachment cast iron plugs. site by the contractor. <br /> ring is used in conjunction 2. All standard threaded Diameter of pipe and grade <br /> with the 30" ID manway. fittings to the primary tank and schedule as called out <br /> Both Fiberglas attachment and monitoring cavity are in other sections. <br /> rings include pre-drilled 4" in diameter. The stan. g. All rigid internal piping shall <br /> bolt holes in a bolt circle to dard secondary contain- be terminated at least 4" <br /> match the 30" manway bolt ment coupling is 6" in from the bottom of the tank. <br /> pattern. diameter. All standard <br /> threaded fittings are half 3.01, 3.02 Installation And <br /> O. Ladders couplings. Reducers are Testing <br /> Shall be standard carbon to be used for smaller sizes Tanks shall be tested and <br /> steel supplied by the tank where specified and pro- installed according to the cur- <br /> manufacturer. Refer to vided by contractor. rent installation instructions <br /> drawings for location. 3. Thread Standards—all provided with the tank (refer to <br /> threaded fittings shall have O/C TANKS publication 3-PE- <br /> R. Heating Coils machine tolerances in 6304 and include as part of <br /> Shall be standard item as accordance with the ANSI your specification). <br /> manufactured and/or sup- standard for each fitting size. <br /> plied by the tank manufac- 4. Strength—NPT fittings will <br /> turer including 22" manway. withstand a minimum of <br /> 150 foot-pounds of torque <br /> S. Tank Lifting Lugs and 1,000 foot-pounds of <br /> Provide lifting lug(s) on ail bending, both with 2:1 <br /> tanks. Lugs shall be capable factor of safety. <br /> of withstanding weight of 5. Reducer <br /> tank with a safety factor of Sizes Standard sizes <br /> 3 Inlet 4" <br /> to 1. <br /> Outlet 4" <br /> Vent 4" <br /> T Probe Drawstring Gauge 4" <br /> Nylon line shall be 200 Ib. Fill 4" <br /> break strength located at <br /> the reservoir monitoring <br /> fitting. Drawstring length <br /> will allow for a 7'tank <br /> burial depth. <br /> 33 <br />