My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Installation InstRctions—All single and Able-wall tanks <br /> A1 . Handling A3. Pre-Installation Testing <br /> *ifting Tanks All tanks must be tested for leaks prior to installation using one of the <br /> seinslallation lift Iug(s)to lift tank. 4an1gle <br /> following methods.In the unlikely event a tank leak is discovered,call the ?r <br /> Larger tanks(10'and 12'dia.) O/C TAN KS Field Service Department to schedule a tank repair:phone <br /> have multiple lift lugs;all must be numbers are listed in section At 9. <br /> used.Guide the tanks with guide Testin Sin le Wall Tanks isual Air/Soo Testlines.Do not use chains or cables 9 9 N P ) <br /> around lank.Do not stand on tank Before installing tanks,remove fitting plugs,apply pipe dope and then <br /> while tank is being lifted. tighten fitting plugs.Pressurize 4'through 10'diameter tanks to 5 psi <br /> Onlyuselifting equipment to movemaximum:12'diameter tanks to 3 psi maximum.Cover the entire tank <br /> tanks.Capacity of lifting equip- outer surface with a soapy water solution(5 gallons of water with 8 ounces <br /> ment must be checked before of household dishwashing detergent).In freezing conditions,substitute 1 <br /> moving tanks. gallon of automotive windshield washer solution for 1 gallon of water. <br /> Double-wall tanks cannot be Soap the entire tank and fittings.The air test is of little value without soap- <br /> ing and a careful visual inspection for bubbles.Test at least 30 minutes to <br /> unloaded from the truck insure there are no leaks as indicated by soap bubbles ora drop in <br /> manually.Single wall fiberglass tanks,eight foot diameter or less.may pressure.Do not approach endcaps or manways while tanks are under <br /> be manually unloaded from the truck at the jobsite by the O/C TANKS pressure.Use an air gauge with half or quarter pound increments so that <br /> trained truck driver. changes in pressure can be easily observed.Do not use a vacuum <br /> Do not roll or drop tank.Fortemporary storage atthejobsite,settanks on gauge. <br /> smooth ground free of rocks and foreign objects and rechock with the Before backfilling to grade,O/C TANKS recommends a 5 psi air/soap test <br /> fires or sandbags provided. on all finished piping connections and unused fittings. <br /> if high winds are anticipated,the contractor is responsible for tieing down <br /> thetanks to prevent damage from being moved by high winds. Testing Double-Wall Tanks(Visual Air/Soap Test) <br /> Double-wall tanks 2,500 gallon capacity or larger may be delivered to the Before setting the the excavation, lu and ti hien all fittings. <br /> jobsite with bum per pads fastened to each end of the tank.The bum per 9 P 9 9 <br /> pads are removed du ring the air/soap test;the tank is installed without Pressure test tanks to 5 psi as follows: <br /> bumper pads. <br /> Outer Wall Test: <br /> A2. Bed and Backfill CAUTION:Pressurizing the tank cavity over 5 psi may damage the <br /> tank.For all tests,install an air gauge at the fitting where the air <br /> pressure hose is connected to the tank and a second gauge at the <br /> All excavated native soil must be other monitoring fitting.Use an air gauge with 1/.or 1h Ib. <br /> ? replaced with approved backfill. increments so that changes in pressure can be easily observed. <br /> 4 Do not mix a roved ravel <br /> natural) PP g Using the O/C TANKS supplied manifold system connected to the inner <br /> Y 1 with sand or native soil.Always tank and the cavil between the inner and outer tank,pressurize the tank <br /> rgraveld 3 use approved gravel.Do not cavity using air pressure from the inner tank. <br /> backfill n layers using sand or <br /> ns <br /> 4 native soil. Step#11: <br /> 1 If backfill does not meet With the manifold valve to the cavity closed,first pressurize the inner tank <br /> our <br /> 2 Y to 5 psi maximum. <br /> 1 the specified requirements, <br /> alternate materials may not be <br /> 4 used without written approval Pressurize the inner tank to 5 psi Maximum <br /> from O/C TANKS. *gauge <br /> to W supply <br /> Gravel ae supply <br /> calve open <br /> A clean naturally rounded aggre- ak gauge <br /> 1 gate with a mix of particle sizes not <br /> 4 less than 1/a"or more than%"is <br /> required. <br /> Crushed Stone or Crushed <br /> 3 Gravel crushed q Washed,crushed stone or gravelsystem(supplied vnih lank) <br /> stone 1 with angular particle size not less Step#1 moritanrig fining <br /> 2 than?angular <br /> more than 1h"are <br /> 1 required. <br /> 4 Note:All backfill materials must Step#2 <br /> meet ASTM C-33 paragraph 7.1 sClose <br /> upply <br /> air supply valve to the inner tank and then DISCCNNECT the air <br /> for quality and soundness.The supply. <br /> backfill should not have more <br /> than 3%passing a#8 sieve.The <br /> dry gravel density must be a minimum of 95 pounds per cubic foot. <br /> In freezing conditions backfill must be dry and free of Ice. <br /> Note:You shou Id require your backfill supplier to certify that the <br /> backfill meets this specification. . <br /> • <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.