My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deadman Anchors <br /> deadmanislull TqMitofoverburdenontopof A8. InstaWn Procedure—Dry Hole <br /> on <br /> side <br /> th an and tank provides <br /> on sato side the anchoring force.Ladeadman Bed <br /> along each side and parallel to Provide a minimum of 12"level approved backfill bed(see Section A2) <br /> tank.The tank must not'over. over hole bottom or concrete slab.Set tanks on bed. <br /> triple shadow'the deadman anchor. DO NOT PLACE TAN KS DIRECTLY ON CO NCR ETE SLA B,TI M BERS, <br /> cable Clamp wire rope with at least three <br /> clamps clamps around deadman and BEAMS OR CRADLES. <br /> through end of strap. DO NOT MIX APPROVED GRAVEL WITH SAND OR NATIVE SOIL. <br /> Alwa use approved gravel.Do not backfill in layers using sand or native <br /> ri se native soil <br /> ys hole size,all excavated o 00 <br /> iI.R ardless of the nes <br /> m e ( ) <br /> 9 <br /> "`)����� � —••-' > •• -����' must be replaced with approved backfill material. <br /> %cente7t8 ieb2f8 tri cross section':..y. <br /> Backfilling <br /> (AII tank models) <br /> Deadmen are made with rein- CAUTION:TANKS INSTALLED WITH BACKFILL TO TOP OF TANK, <br /> #6Ispnedforced(2-86rebars)concrete.The BUTWITHOUT BACKFILLTO GRADE SHOULD BE COMPLETELY <br /> cross section dimensions may FILLED WITH WATER OR PRODUCT AS BALLAST..DO NOT PLACE <br /> smo .� vary depending on burial depth. WATER OR PRODUCT IN TANK UNTIL BACKFILL IS EVEN WITH TANK <br /> reba3• (contact the Fiberg/as Tank TOP. <br /> centInstallation Manager for details).If <br /> minimum burial depth is 24"(44" <br /> for 12'diameter tanks),minimum <br /> deadman size is as follows: long-handledTank Min. probe long-handletl <br /> heig ,ebai Probewidth Diameter Height Width' First 12"lift of <br /> 0 12" x 12" First backfill <br /> 1 , <br /> 10' 12" x 18" 12' lift of <br /> 12' 8" x 36" backfllf <br /> 'A round cross section can be substituted if the diameter equals or exceeds I <br /> the deadman width. <br /> When using deadman anchors in multiple tank installations each tank will <br /> require two deadmen.if one deadman is used for adjacent tanks it must <br /> be doubled in width.A separate anchor point must be provided for each '`, t2^ bed `'`t2 °°d <br /> strap.Rebar anchor points are incorporated with their legs anchored - • <br /> under the re-bar reinforcement.Spacing for anchor points is determined 'It's critical that this area offer full support undertankand end caps. <br /> by the number of anchor points shown on tank drawings. <br /> An anchor point can be fabricated from rebar asfollows: Min.Rebar Use same materials as bedding. <br /> Tank Diameter Rebar Size It strap/anchor point) Width long-handled Place first 12"lift evenly around <br /> probe tanks.From the bank or adjacent <br /> 4',6' N6 41/2" tank top,backfill must be pushed <br /> 8' #8 8" completely beneath tank bottom, <br /> 10'.12' #10 12'/2" between ribs and under endcaps <br /> Turnbuckles(optional) Second to provide necessary support.A <br /> Hook,Jaw oreye-type turnbuckles(drop-forged)ma be used in lace of 12" lift of long handled probe can be used <br /> Y P <br /> all oraportion of the cavbackfill to penetrate backfill and push ite rope described in this section. , between all ribs and at 3 to 5 points <br /> All Anchoring Methods under endcaps.Place another 12" <br /> Minimum per anchor location. - lift of backfill evenly around tanks. <br /> Tank Diameter 4',6' 8',10',12' - Repeat the probing of backfill from <br /> t2^ bed"`' the bank or adjacent tank top. <br /> Drop-forged Turnbuckle Diameter. kmiiii " <br /> HookType 1/s" 1'/a" 'It's critical that this area offer full support under tank and end caps. <br /> Jaw Type '/z" a/^ completion of second lift,After cont <br /> Eye Type 1/'11 3/a" P <br /> Wire Rope Diameter: long handled probe backfill can be brought to top of <br /> 6x19 '/z" tanks or grade without additional <br /> (improved plow steel) handwork.(Compaction maybe <br /> required for slab support.) <br /> Do not use wire eyebolts or bent steel eyebolts. <br /> CAUTION:TANKS INSTALLED WITH BACKFILL TO TOP OF TANK, This method will not work in tight <br /> BUT WITHOUT BACKFILL TO GRADE SHOU LD BE COM PLETELY areas in straight-walled holes.The <br /> FILLED WITH WATER OR PRODUCT AS BALLAST.DO NOT PLACE a'curved angle necessary to probe the back- <br /> WATER OR PRODUCT IN TANK UNTIL BACKFILL IS EVEN WITH probed section fill under the tank can not be made <br /> TANK TOP. with the long-handled probe. <br /> Straight-walled holes in tight areas <br /> Fiberglas tanks can also be anchored safely by using burial depth and <br /> a - will require a curved probe to <br /> surface slab to offset the buoyancy factors.For alternate anchoring backfill under the tanks. <br /> methods,contact the O/C TANKS Installation Manager. "" ' The curved probe is a 4'section of <br /> the long handled aluminum probe <br /> Optional Top Cable Clamp Method bent on a radius to match the tank curvature.A leveraging action on the <br /> The optional top cable clamp long-handled probe creates a pushing action under the tank bottom. <br /> guidesmethod may be used to secure The following procedure is the most effective for the curved probe: <br /> hold cables anchor straps at the top of the tank. a.Atter setting the tank on thegravel bed,probe the entire tank bottom <br /> Clamp cable to strap using atleast and aroundtheend caps. <br /> 3 clamps.Thread cablearound <br /> deadman(or through anchor b.Place the first l2"lift of backfill. <br /> points)and bring to top of tank. c.Probe the entire tank bottom and end caps again. <br /> Position wire rope in cable guides d.Place the second 12"lift of backfill. <br /> tokeepwireropeonthestrap. e.Switch to straight probe section and probe tank again. <br /> Repeat procedure on the other WARNING:ENTERING THE TANK EXCAVATION IS DANGEROUS: <br /> end of strap and clamp cables COLLAPSING EXCAVATION WALLS CAN CAUSE INJURY OR <br /> together at top of tank using come- DEATH. <br /> along to snug wire rope;then triple <br /> clamp. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.