My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:55:27 AM
Creation date
11/8/2018 9:39:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\REMOVAL 2004.PDF
QuestysFileName
REMOVAL 2004
QuestysRecordDate
8/2/2017 4:07:09 PM
QuestysRecordID
3544641
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICA* <br /> Project Location:e 105.0 P/ ftCAvAwyLr 7�yKyi CA, ?S-37165-, � <br /> Owner: &-Iks Phone No: / ry s� ./ <br /> Contractor: Gl-G• Me l d"Cy Phone No:� �rOF- 7 ed-112/cp License No: 71k a? /3 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> A. Pea gravel--smooth,rounded material not more than one-half(1/2)inch in diameter <br /> Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. 44" e <br /> baGkfill- 7-4 <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofroject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5 cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame not <br /> * ' S <br /> to t <br /> r <br /> tgnature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> EI-123046 (Revised 10/16/03) Page 1 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.