Laserfiche WebLink
UST INSTALLATION NOTES 1 7"CONCRETE SLAB / <br /> AT 87.6 LB/CF � <br /> 1. REINFORCE CONCRETE SLAB WITH#4 BARS AT 16"0. REINFORCING BARS TO BE NO LESS THAN 2"NO i <br /> MORE THAN 4"FROM SURFACE. <br /> 2. REINFORCE CONCRETE SLAB AROUND MANHOLE WITH(2)#6 REBAR 60"IN LENGTH EACH SIDE. PLACE �/� <br /> REBAR 6"FROM SIDES OF MANHOLE. J /K/ (((/�,e r,V <br /> 3. SINGLE 1"CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL-OFF AT SUMP d BUILDING WIRING <br /> TROUGH. CONTAINS LINE VOLTAGE WIRING. <br /> �� �� archit "eering <br /> 4. SINGLE 1"CONDUIT TO EACH TANK.LOOP HOME RUN FROM INTERSTITIAL SENSOR LOCATION TO I iii"' / e n g i nee r i n g <br /> CONTAINMENT SUMP SENSORS AND TANK GAUGES. PROVIDE SEAL-OFF IN BUILDING AND AT TANK. ,' <br /> ROUTE TO INTRINSICALLY SAFE TROUGH IN BUILDING.CONTAINS ONLY LOW VOLTAGE WIRING FOR <br /> SENSORS. / <br /> L}-IB & ,Associcntes� Ltd. <br /> RECEIVED <br /> 5. USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN 1/8"8 MAX OF 3/4"IN SIZE, 867 Pacific Street, Suite 120 <br /> FREE CLAY,SLAG,CINDERS,OR DEBRIS.ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S San Luis Obispo,CA 93401 <br /> AND OWNERS FIELD REPRESENTATIVE. ph 805.540.5240 <br /> 6. TANK PAD MINIMUM 2'-0"OFF OUTSIDE WALLS OF TANKS,AND MUST COVER THE FOOTPRINT OF THE BUOYANCY CALCULATIONS(20 000 GALLON TANK) kA 2 2 2018 fax 805.540.5241 <br /> TANKS. REQUIRED TO PROVIDE FOR PROPER TANK HOLD DOWN,AND TO PREVENT ACCIDENTAL DRILLING I <br /> www.LHBassoc.com <br /> CALATION BASED ON SUBMERGED WEIGHT OF MATERIALS: <br /> INTO TANK I ' F CUL <br /> "CONTAINMENT SOLUTIONS"TANK WITH SPHERICAL ENDS. ENVIRONMENTAL <br /> 7. CUT CORNER WHERE MEETING ASPHALT PAVING ONLY, SQUARE CORNERS WHERE MEETING CONCRETE. �- w TA NOMINAL) HEALTH DEPARTMENT <br /> O TANK LENGTH:37'-5 1/2" _ � � <br /> > q S BF,1 <br /> 8. REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS AND NUMBER OF PRODUCT LINES. (2) O TANK DIAMETER: 10'-0" �S/ <br /> \ SUMPS m TRY 36'-0"DEADMAN,EACH SIDE, 18"WIDE x 8"HIGH <br /> 9. THE PROPOSED FUEL STORAGE SYSTEM SHALL BE A XERXES SYSTEM(OR APPROVED EQUAL)WITH z EMPTY TANK UPLIFT= 19.951 GAL =2,667 CU FT ti0� �O <br /> DOUBLE WALL,TURBINE ENCLOSURE, FIBERGLASS HYDROSTATIC TANK WITH LEAK DETECTION 7.48 GAL/CF ray O .- <br /> SENSORS,AND MEET OR EXCEED ALL CALIFORNIA TITLE 23 AND CUPA REQUIREMENTS. 2,667 CU FT X 62.4 LBS/CF=166,436 LBS(DISPLACED WATER) ir No.78916 P <br /> * e . 03/18 <br /> XA I ___� A TANK SUMP UPLIFT=(2)X 3.14 X 2'2 X 4'= 100.5 CU FT (P ` �Q <br /> yT I <br /> 100.5 CF X 62.4 LBS/CU FT=6,271 LBS(DISPLACED WATER) F OF CAL\FO <br /> O O TOTAL TANK UPLIFT=166,436 LBS+6,271 LBS= 172,707 LBS 1 <br /> I I <br /> HOLD DOWN CALCULATION <br /> CONSULTANTS <br /> 1.TANK SLAB: <br /> .58'X 140'X42'=341 CU FT <br /> 341 CU FT X 87.6 LBS/CU FT=29,872 LBS j <br /> TANK 1 5, 2.CUBED BACKFILL ABOVE TANKS <br /> 1010 <br /> D 0 GRAVEL 4'X 10.0'X 37.5'=1,500 CU FT-100.5 CU FT= 1,399.5 CU FT <br /> 9,750# 1,399.5 CU FT X 57.6 LBS/CU FT=80,611 LBS j <br /> O6 COLUMN 3.CURVED BACKFILL ABOVE TANK <br /> 4O 3.14X5.0'2X37.5'=2,943.8 CU FT <br /> I 10.0'X 10.0'X 37.5'=3,750.0 CU FT <br /> .67'x1.5'x36' <br /> 3,750.0 CU FT-2,943.8 CU FT=806.2 CU FT=403.1 CU FT <br /> S 2 <br /> DEADMAN 403.1 CU FT X 57.6 LBS/CU FT=23,219 LBS j �IpFFSS/O°, <br /> \ 4.GRAVEL COLUMN ABOVE'X 2=1, � � .1 S BSA�O` <br /> 1.5'X 14.5'X36.01,566 CU FT � <br /> 1,566 CU FT X 57.6 LBS/CU FT=90,202 LBS j uJ O <br /> _ 5. CONCRETE DEADMEN: C3 irLu A <br /> * <br /> 0.67'X 1.5'X 36.0'=36.2 CU FT a 78/16 e . 03/18 <br /> 36.2 CU FTX 87.6 LBS/CU FTX(2)=6,342 LBS j <br /> 15:DRY WEIGHT OF TANK: 9,750 LBS <br /> yT I VVV III <br /> F' TOTAL HOLD DOWN 239,999 LBS j F OF CALNFO <br /> `j TOTAL HOLD DOWN: 239,999 LBS=1.39 SAFETY FACTOR <br /> TOTAL TANK UPLIFT: 172,707 LBS <br /> REVISIONS <br /> PLAN CHECK#16-3684 <br /> 07 DECEMBER 2016 <br /> QENGINEERING PLAN CHECK <br /> 2 #16-3684,3685 29 MARCH 2016 <br /> QSJC EHD PLAN CHECK <br /> #SR0076222 8 NOVEMBER 2017 <br /> SUBMITTAL DATES <br /> OWNER: <br /> 03/29/2016 <br /> -1I-III11--_-II-i1I--1I1I-I1--IIIII1IIIIIII1I----I-_III1II1II---III1IIIII1 IIII-----1II <br /> F Na <br /> • .. <br /> � I �( 2 alll °•o °o ° a ° • a o•° O � �_ ° � ° n <br /> • I /_ - - 1 6 <br /> o <br /> ° °°• . ..° ° II11=1I1I1II11_=IIII1III=1_I11I II1II11--I_-1IIII11III_=1_ <br /> II111II11-- <br /> I1I11 <br /> I1 <br /> - <br /> II <br /> II ORE.TG.B. AGENCIES CI: <br /> ES <br /> FS-5 FS-5 FS-5 <br /> A.C. PAVING TANK SLAB 24" <br /> TYR PROJECT NO. <br /> 3 3 <br /> 15-13-001 F0S-1o DRAWN BY. <br /> °. 4 . CHECKED BY <br /> 1"CONDUIT LOOPS TO fIII-II - II SUM °. _ JRB <br /> 1"CONDUIT HOMERUN O O p ! II _ I1_1II <br /> -1 I -I I -I I I-- <br /> TO BUILDING o o. o 0 o. o'°I %0*4"SCH 40 PVC OR FRP o o° o <br /> RISER TO ' ° 0. <br /> ° °o, ° ° °° , O Co..o ° °GRADE 0. <br /> 4"BLACK STEEL RISER PRODUCT PIPING •Q <br /> -I- - SUMP MONITOR LIQUID SENSOR VENo o °°-1 _III-111 O o o. •• <br /> o•II I o °O <br /> o ° °° TYPICAL ° 1=1 1I`1-III=I1 ° o <br /> I-II - R ° o° o ° I- M <br /> ° -O ° II II �I w°°• ° o o• Q <br /> HYDROSTATIC ° -11 1=1 1 I 11 I_= <br /> 00, <br /> RESERVOIR _I -II I U K Of <br /> -11-11 ° ° o ° Q <br /> ' ;o oII = II-III- W o - <br /> = o•°•° oo <br /> 1lII-_III • �� �II I-III-III-I F- <br /> I Wf \ o ° _ <br /> 1IERACTOO <br /> ,� ° ° III-III-III OWN Z <br /> _ F TTING o I-III-III- <br /> VIII-III / .1 GPH MAG PROBE \ - - - - \\ III-III- c� O U <br /> _ TANK LEVEL GAUGE OVERFILL VALVE SET \ I-III-III- G p W <br /> I (dJ 95Yo \ � i­- <br /> III=III-I <br /> 1111111111115 <br /> PEAGRAVEL AS PER <br /> BACKFILL WITH -III- 0 ° • o / 1 -III-III- V <br /> e o° 20,000 GALLON <br /> _ o • REGULAR II •°'o III-III <br /> - I <br /> TANK MANUFACTURER 1 -111-I .'o°o °O I UNLEADED I-II-I <br /> SPECIFICATIONS -111-I ° I I STRAIGHT DROP TUBE /I o -I - <br /> -TYPICAL -1 I I-III 0 •o <br /> _ � � I-III-I� <br /> -III-IIIIII-III_ <br /> -111- ° Oo. <br /> °° ° \ TRAPPER SCREEN _ <br /> -III-III `°° TYPICAL <br /> SHEET TITLE <br /> ° <br /> -_ - °°'°°° ° O N _ I I_I I- n <br /> =11 11I 1 ° • o °° ��� _ // I-III-I c 20,000 GALLON <br /> III-I ° � �i -III= DOUBLE WALL <br /> :III=III o 0 <br /> _ _ _ _ - - - - - - - - - - - - - - - - =11 ' LL FIBERGLASS <br /> -III-I - - - - - - - - - - _ _ _ <br /> III-III o ° Oo.°•Qo.°o 00 ° oO1° O °O =Oo ° OOeoo o oO q. oo° O oo Q Oo• ° ° ° ° °•°•° ��°°'°•° O • o° °o • °C,.QST L ° o ° <br /> _ ° o (2)f,2"x,2"xJ��c7 � ° °•'° III=11 K TANK INSTALL <br /> -11 I-I ° o °O °° OO TANK SHALL BE SET LEVEL O ° 0 O °O ° 0••° ° o• • o O TI MANI}FACTbR'° ° Ro°oo:° ° 4 0 <br /> I- <br /> ' � m � DETAILS <br /> - - C <br /> -1 i_I I I-III III-I I_I I-III-III-III-III-III I I I_I I -I I_I I ;III-III_III-III_III-III-III_III-III-III_III-III_III_III-III-III-III-I I_I I I-III-I - - - - - - - - - - - - ° <br /> _ --= I_I I_I I-III-III-III-I I I_I I I I I_I I_I 111 I; <br /> -1 I -III iii=� �- III =1 I-1 -1 I -1 I-1 I-1 1=i III III_III_III-I I I_I , I I I II I I I_I -I I_I I I=-I I_I I-III-1 _III-III , <br /> =1 I I-1 I I-1 I I-I I I II ,I I 1=1 I I-I I-- I .III- <br /> (4)12"x12"x11GA STEEL STRIKER PLATES III- I=1 I -I I 1-1 I I_ I I-1 I I- (- <br /> TYPICAL UNDER OPENINGS WITH MANWAYS BY -III-III-' I- <br /> a SHEET NO <br /> TANK MANUFACTURER END OF TANK <br /> MIN. TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER T-0°MIN. o <br /> EX ONLY ION ONLYION FS-4 <br /> O)UqN[DERGROUND TANK SECTION (20,000 GALLON) <br /> SCALE: 1/2"=1'-0" <br />