My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cesar Ruvalcaba [EH] <br /> From: JR Beard <jrb@lhbassoc.com> <br /> Sent: Monday, December 4, 2017 7:47 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Subject: RE:SR0076222 comments <br /> Attachments: Buoyancy Tank Calcs.pdf <br /> Hi Cesar, <br /> Regarding Buoyancy Calcs,fortunately the error was on the conservative side since the Factor of Safety went up to 1.41. <br /> Regarding the calculations for the drop tube,thank you for sending the PDF. <br /> Please note the instructions you sent require that the tank be installed and that actual measurements need to be taken. <br /> These calculations need to be performed after tank installation by the installing fuel contractor to determine actual drop <br /> tube length. Field measurements are required. <br /> Thanks, <br /> 1R Beard, P.E. <br /> Principal <br /> LHB&Associates <br /> 867 Pacific Street, Suite 120 <br /> San Luis Obispo, CA 93401 <br /> C: (805)452-3664 <br /> 0: (805)540-5240 <br /> F: (805) 540-5241 <br /> -----Original Message----- <br /> From: Cesar Ruvalcaba [EH] [mailto:cruvalcaba@sjcehd.com] <br /> Sent: Monday, December 04, 2017 3:28 PM <br /> To:JR Beard<jrb@lhbassoc.com> <br /> Subject: RE:SR0076222 comments <br /> JR, <br /> Elena was off today,she might have some more comments on the submitted plans. I can let you know what I found that <br /> still needs correction so that you can start working on making the changes. <br /> The calculations for the drop tubes on the 8,000 and 12,000 gallon tank are in disagreement with the values that we get <br /> versus the values that are on the provided sheets. Please recalculate the"B"value, it appears the wrong column on the <br /> tank chart was used for the two tanks.There are additional steps that need to be used when calculating the drop tube <br /> measurements. I've included the 7150 Overfill Prevention Valve instructions for calculating it's position at the 95%tank <br /> capacity. Follow the instructions provided for all three tanks. <br /> The Buoyancy Calculations for the 20,000 gallon tank on page FS-3 seems to have an addition error in the total tank <br /> uplift calculation. It is shown that 166,436 LBS+6,271 LBS= 176,486 LBS. We get over a 3,500 LB difference. Please <br /> verify that math calculations are correct and that any changes are made to affected calculations. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.