Laserfiche WebLink
s Figure 3-2 <br /> Tank sump Body Extension <br /> e - - <br /> In freezing conditions,protect collar and tank sump from water <br /> accumulation.Freezing water may cause damage. <br /> 2.1. Visually inspect the tank sump components for shipping <br /> or handling damage.If damage is found,contact Tank <br /> Tank Sump Body <br /> CSI Field Service. Extension with <br /> 2.2. Wear gloves. <br /> EnclosureTop <br /> Trim to adjust <br /> 2.3. Do not roll,drop,abounce. forfinal height <br /> 2.4. Tank sump parts and kits should be stored in upright <br /> position. 33. Field cuts must be with in-14'of square.Gaps between <br /> 2.5. Set on smooth surface. twojoints greater than W must be covered with <br /> 2.6. The tank sump must be secured to prevent damage maximum width'A'tape.This prevents resin from <br /> from high winds.Proper precautions should be taken to running into joint <br /> protect adhesive channels. 3.4. Maintain a minimum of 4'on the tank sump body <br /> 2.7. All assembly kits(Klt-AD or KII should be stored in a extension to complete interior joint. <br /> cool/drylocatlonatW-70'F.Higher temperatures will 3.5. Even if mating surfaces have arrived from the factory <br /> shorten shelf life.Use by expiration date shown on the abraded,the contractor must re-sand the mating <br /> box label. surfaces within four hours of adhesive or III <br /> s application. <br /> e <br /> 3.6. Remove any rocks,and/or debris from adhesive channel. <br /> 3.7. Sand and clean mating surfaces until white in color. <br /> Tank sump mug be Isolated from direct traffic loading. 3.7.1. Adhesive Joints-Sand the surfaces that will contact <br /> the adhesive,then wipe free of dust with a clean <br /> 3.1. Dry fit all tank sump components prior to installation. cloth. <br /> 3.1.1. Determine any length changes required to insure the 3.72. Layup Joints-Sand a minimum of 4'onto each part <br /> minimum required clearance between the tank sump where the layup will be applied,then wipe free of <br /> top and concrete. dust with a clean cloth. <br /> 3.12. Confirm enclosure top and reservoir are level. 3.73. Ensure mating surfaces are free of contaminants and <br /> 3.1.3. Verify fill/vapor spill buckets and sensor will properly dry <br /> align with lid opening.This is achieved by installing 3,7,4. Do not use oil-based solvents,soap,or water to clean <br /> the top section of the tank sump so that the reservoir surfaces. <br /> opening is oriented 90'from the tank centedine <br /> (see Figure 3-1). 3.8. Insert channel mesh material provided with adhesive kit <br /> Figure 3-1 360'around each joint(see Figure 3-3). <br /> All/Vapor EnclosureTop Alignment Figure 3-3 <br /> U ntAdhesive Channel <br /> T.,V r. <br /> INSERT CHANNEL MESH <br /> 360'IN EACH JOINT <br /> e <br /> d+ d d <br /> a <br /> aae <br /> mnea rat Allgnmem mmiwct Ponau9nmmt 3.8.1. Mesh is supplied longer than required.Trim end to fit <br /> Without gap or overlap. <br /> 32. If required,trim tank sump body extension using a <br /> carbide tipped blade or a masonry blade.The tank sump <br /> body extension is the only component of the tank sump <br /> that can be trimmed(see Figure 3-2). <br /> 3 <br />