My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGLEAK DETECTION N 2M R9 <br /> Iota <br /> erwwweco nuc ocrecrian <br /> September 14, 2017 <br /> Site Location <br /> Chevron <br /> 1490 South Main Street <br /> Manteca, CA 95337 <br /> Subject: Work Plan for IOTA VaporTite Pre and Final ELD Testing Services <br /> To Whom It May Concern: <br /> CGRS is pleased to present you with this work plan for pre and final enhanced leak detection (ELD) <br /> testing services for your project at the above referenced location. CGRS will utilize the iota VaporTite <br /> V005 (LG 113) to perform the final ELD post installation test as required by the State of California. This <br /> test method has been evaluated by the California State Water Resource Control Board and determined <br /> to meet the performance requirements for post installation ELD testing(see LG 162-3 attached). <br /> O Pre Testing will be performed on the primary containment portion of the fueling system with <br /> the IOTA test method while the tank top and product,vent and vapor piping is exposed, prior to <br /> backfilling. Any problems encountered during the pre testing will be addressed by the <br /> installation contractor and retested by CGRS the testing crew. <br /> O Final ELD testing will be performed on all primary fuel containment system components once <br /> the fueling system has been completed (everything below grade surface) backfilled, concrete <br /> poured, and the system is essentially ready to receive fuel. This will provide the installation <br /> contractor, general contractor, design engineer, site owner and operator with third party <br /> certification that the system is "vapor tight' before it ever receives fuel. <br /> CGRS holds a current California Contractors License with a Hazardous Materials endorsement. All final <br /> ELD testing will be performed by a certified IOTA technician holding a current California Tank Tester <br /> license. <br /> If you have any questions regarding any aspect of this work plan. Please don't hesitate to contact me at <br /> 1-800-288-2657. <br /> Sincerely, <br /> Chris Murphy <br /> Director of CA Operations <br /> CGRS, Inc. <br /> 5444 Dry Creek Rd. Sacramento, CA 95838 T 916-991-1100 F 916-991-1177 www.cgrs.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.