My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO 2013 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:18 PM
Creation date
11/8/2018 9:41:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2015
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\3440\PR0231173\COMPLIANCE INFO 2013 - 2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 25 13 05:22a Reliable PetrolPlim 2POR458953 p,5 <br /> RECEIVED <br /> JUL 2 5 2013 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3sets of plans&applications as originals wil. be retained by E EgALTH DEPARTMENTEAL <br /> I. Site map enclosed? YES[ NO <br /> 2. Submit copies of fCC Service Technician ano;cr Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Titie 8. <br /> 3 Detailed description of work to be completed. List components to be repaired er replaced and attach a diagram drawn <br /> to scale showing location of repairs andfor replacements. If repairing a component; describe how this will be done. (if <br /> ad--;no piping, UOC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Appli <br /> pages 4-8 as necessary for a timely plan review): cation <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> L <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.