My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:03 PM
Creation date
11/8/2018 9:41:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\3440\PR0231173\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER.GROM STORAGE;TANK <br /> RESPONSE PLAN--PAGE 1. (010 form PC,fb6llj j <br /> PE OF At;1'10N 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION .+o <br /> TY <br /> _ L FACILITY INFO`-RMMATTION�� <br /> FACILM ID0 (.fgenry i;ra Unly) <br /> BUS Il SS N (Same as FACI.ITY NAME) <br /> N -- ----— <br /> BUSINR S 31T,.F3 ADD i CITY grit. 'j <br /> H. SPILL CONTROL AND CLEANUP IVLETHODS <br /> This plan <br /> This unauthorized r:;icascs from UST systems and supplements the emergency response plans grid procedures in the fac fly's Hazardous hL e:itis <br /> Business Plan. <br /> A If saki to do so,facility personnel will take immediate monsurea to control or stop any release(e.g.,activate pump slut-off;etc)and,if necema:y,3d9ely:-,move <br /> retnainu;g bazardous material from the UST systtm. <br /> A Any release to secondary ooniainment will be pumped or otherwivc removed within a time consistent with the ability of the secor"Acy conft'nment system to <br /> contairt tale hazardous material,broil not greater than 30 calendar days%or sooner if required by tho local agency. Ro severed hazy anus mater,'21s,1.nless sti'd suitable <br /> for their intended use,Nvill be ma Caged as huardous waste. <br /> Ahwrbent material will ba used to contain and clean up manageable spills of haza;dods materials. Absorbent matcrial which has beco:te too saturated to be ' <br /> effective or which is no longer intended for use will bt managed as hAmrdow waste uulass a.waste determ ination in accordance with 22 CCI:;;56262-11 finis:hat <br /> it is non-hazardous. Used absorbent materia],reusable or wasta,will be stored in a properly labeled and�, a crP.t3int7. `Nasty material shat; be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether arty water removed from secondary containment systems,or from clean-up activity, hea bac:, in Ycatai t w,,Lh ary <br /> hazardous material.If die water is contamn%fed,it will be tnmagad.ns.hazardous waste unless a waste determination in accordartce with 22 CCR$66262.i 1 finds <br /> that it is notrhazardous- If the water has a petroleum sheen(i.s,,rainbow colors),it is colmtaminatrtd. A thick floating petroleum layer may-rot necess.ri'y display <br /> rainbow colors. Water(hazardous or non-hazardous)fmm ahmps,spill containete,etc.will not be disposed to storm water systems, <br /> ➢- We will review secondary containment systems for possible deterioration if any of the fin?lowing conditions occur, <br /> I. hazardous material in contact with secondary corrtainment is not compatible v ith the material used fbr secondary vintainment; <br /> 2. Secondary containment is prone to de nage from any equipment used to✓move or clean up hazardous material wheeled in secondary containment; <br /> 3. hazardous malarial,other than the p:oductlwastt sW-,td in the primary contafnmrtertt system, is placed inside secondary contairrnect to:;cat or ne.a'Ta1;7e <br /> released prodactlwas:c,and the added mnaterial.or resulting material from such a combination is not compatible with secondary co:ttaiam--;t. — <br /> _ III. SPILL CONTROL AND CLEAN—YTP EQUIPMENT <br /> PXWODIC MAINTMANCB:Spill control and clean.up equipment kept.permanontly on-site is listed in the facility's F?azardous Materials Businuss p[sn. This t <br /> equipment is inspected at least nrondhly,and m3er each use,supplies art replenished as needed Defective equipment is repaired or replaced as ncoeM� ry. <br /> UIPMZNT NOT MMA.niEWI LY OlY srm BUT AVAILABLE FOR USF.IF NEEDED: (Com lett onl if applicably} � <br /> IQUD `Nr _ LOCATION AVAILAI3URY <br /> �f 14- __ � ; moo. <br /> Rll. �— R21. �---- ..------ —d <br /> R12. R27. R32. <br /> )(13. _.- _._ -_�4,T_i <br /> RId. R24. -- -- ---Rao <br /> R13. R25. ------------- _. <br /> P.35. <br /> _ ___ W. WSPONSISLE PERSONS ---��._-- <br /> TM MLLOWINI�VVRSON(S)INI ARE RESPONSULl FOR AU'I'f1t)RIMNG ANY WORK NECEMARY UNllER TITIS RESPONSE PLAN: � 1 <br /> :YAIyIE - _ —--— Rao: 7TI`LIS <br /> 1YANILr - <br /> ��^^ R,u. <br /> XUR <br /> XME <br /> TTPLF <br /> NANEE -- riga. 'ITTI --... ---- ,ts3. <br /> V- MONITORMG INDICATORS-------------- <br /> IF MONiT AMO II�II�ICATE.S A POSSIBLE UNAUTFIORtM R13LEA48,Snn TO VERIFY THE RaZkSE WILL BE 74"ADE AS FOLL()zNS: <br /> 13 Additional system testing or dela collectionInspeotion by qualified persons I.7 Recalibration of equipment <br /> Odmer: <br /> ZSR. <br /> C1S`P Response <br />
The URL can be used to link to this page
Your browser does not support the video tag.